OKAY KE TU?? πŸ€ͺ

OKAY KE TU?? πŸ€ͺ

Professional Development

β€’

13 Qs

quiz-placeholder

Similar activities

SEMALAM DAH BELAJAR KAN? πŸ˜‡

SEMALAM DAH BELAJAR KAN? πŸ˜‡

Professional Development

β€’

10 Qs

IPL

IPL

1st Grade - Professional Development

β€’

15 Qs

WCS 1105-3 - Knowledge Assessment

WCS 1105-3 - Knowledge Assessment

Professional Development

β€’

10 Qs

Diodes

Diodes

Professional Development

β€’

9 Qs

Kursus Hybrid KKKB (Safety)

Kursus Hybrid KKKB (Safety)

Professional Development

β€’

10 Qs

SJIT ECE- ELECTRONICS OBJECTIVE TEST-2 @ 26/8/21

SJIT ECE- ELECTRONICS OBJECTIVE TEST-2 @ 26/8/21

Professional Development

β€’

10 Qs

F023 TAv07 KLPs 07.03.01-04

F023 TAv07 KLPs 07.03.01-04

Professional Development

β€’

8 Qs

Electrical Machines

Electrical Machines

Professional Development

β€’

15 Qs

OKAY KE TU?? πŸ€ͺ

OKAY KE TU?? πŸ€ͺ

Assessment

Quiz

β€’

Other

β€’

Professional Development

β€’

Medium

Created by

Nurin Afiqah

Used 3+ times

FREE Resource

13 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec β€’ 1 pt

What does NVAC stand for?

No Voltage Automatic Changeover

Non-Volatile Automatic Changeover

Network Voltage Adjustment Control

Normal Voltage Automatic Control

2.

MULTIPLE CHOICE QUESTION

20 sec β€’ 1 pt

What is the primary function of the 750V DC Traction Network System?

To control train signaling systems

To manage energy storage systems

To distribute AC power to stations

To supply traction power to the LRV

3.

MULTIPLE CHOICE QUESTION

20 sec β€’ 1 pt

What is the purpose of the inter-tripping scheme in the 132kV and 33kV systems?

To disconnect faulty circuits quickly and reliably

To increase the voltage of the system

To connect multiple power sources

To monitor the health of the equipment

4.

MULTIPLE CHOICE QUESTION

20 sec β€’ 1 pt

Which of the following is NOT a component of the power transformer?

Conservator

Surge Arrestor

Voltage Regulator

Bushing

5.

MULTIPLE CHOICE QUESTION

20 sec β€’ 1 pt

What happens when the No-Volt Automatic Changeover (NVAC) scheme is initiated?

It automatically closes all circuit breakers

It restores power supply immediately

It disconnects all power sources

It opens the related infeed circuit breakers

6.

MULTIPLE CHOICE QUESTION

20 sec β€’ 1 pt

What is the function of the Blue Light System (BLS)?

To control the operation of transformers

To monitor voltage levels

To de-energize traction power rail sections

To provide emergency communication

7.

MULTIPLE CHOICE QUESTION

20 sec β€’ 1 pt

Which of the following is NOT a major equipment in the PS&DS system?

132kV Gas Insulated Switchgear

750V DC Switchgear


High Voltage Transformer

33kV Remote Control Panel

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?