
Minor Assessment (Mod) - Domains 1 - 3
Quiz
•
others
•
4th Grade
•
Practice Problem
•
Hard
Stacye Griffin
Used 1+ times
FREE Resource
Student preview

86 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Create a Sketch to see if it fits your client needs when beginning a new project.
Create a Sketch to see if it fits your client needs when beginning a new project.
Start coding immediately without planning.
Ignore client feedback and proceed.
Finalize the project without a prototype.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Typographical needs, cultural considerations, age, education and others are all Accessibility considerations.
What are the Accessibility considerations?
What are the typographical needs?
What are the cultural considerations?
What are the age considerations?
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is a Wireframe?
A Wireframe is a visual guide that represents the overall look of a website.
A Wireframe is a type of software used for coding.
A Wireframe is a tool for creating animations.
A Wireframe is a database management system.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Iteration is the cycle of a design plan. The first cycle can be a sketch.
What is iteration in the context of a design plan?
What is the final stage of a design plan?
What is the purpose of a design plan?
What is the role of color in a design plan?
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Change Orders are formal and should be officially requested and approved or denied.
What are Change Orders?
Informal requests that can be ignored
Unofficial suggestions for project changes
Casual notes for project adjustments
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The order in which feedback is presented on an aspect of the project is called Feedback Loop. An example could be that peers may look at the prototype and then the next step may be client feedback.
What is the order in which feedback is presented on an aspect of the project called?
Feedback Cycle
Review Sequence
Evaluation Order
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A Timeline is all of the elements that need to be completed and the estimated time of completion; they need to understand the depth and breadth of the project.
What is a Timeline?
What is a Gantt Chart?
What is a Milestone?
What is a Project Plan?
Create a free account and access millions of resources
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Popular Resources on Wayground
10 questions
Forest Self-Management
Lesson
•
1st - 5th Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
30 questions
Thanksgiving Trivia
Quiz
•
9th - 12th Grade
30 questions
Thanksgiving Trivia
Quiz
•
6th Grade
11 questions
Would You Rather - Thanksgiving
Lesson
•
KG - 12th Grade
48 questions
The Eagle Way
Quiz
•
6th Grade
10 questions
Identifying equations
Quiz
•
KG - University
10 questions
Thanksgiving
Lesson
•
5th - 7th Grade
Discover more resources for others
10 questions
Forest Self-Management
Lesson
•
1st - 5th Grade
11 questions
Would You Rather - Thanksgiving
Lesson
•
KG - 12th Grade
10 questions
Identifying equations
Quiz
•
KG - University
18 questions
Kids Christmas Trivia
Quiz
•
KG - 5th Grade
18 questions
Thanksgiving Trivia
Quiz
•
4th - 12th Grade
10 questions
Identify the Thanksgiving foods
Quiz
•
3rd - 4th Grade
8 questions
Predictions
Quiz
•
2nd - 4th Grade
20 questions
Thanksgiving
Quiz
•
KG - 12th Grade