ISTQB Advance Level Technical Tester

ISTQB Advance Level Technical Tester

Professional Development

30 Qs

quiz-placeholder

Similar activities

Classification Review

Classification Review

Professional Development

26 Qs

Anesthesia machine

Anesthesia machine

Professional Development

25 Qs

Engines3 o7

Engines3 o7

Professional Development

32 Qs

Java loops and nested loops

Java loops and nested loops

Professional Development

29 Qs

PROF ED 3

PROF ED 3

Professional Development

30 Qs

Pulmo Mock

Pulmo Mock

Professional Development

25 Qs

Circuit Isolation

Circuit Isolation

Professional Development

25 Qs

hacking History & Types Basic

hacking History & Types Basic

Professional Development

25 Qs

ISTQB Advance Level Technical Tester

ISTQB Advance Level Technical Tester

Assessment

Quiz

Education

Professional Development

Medium

Created by

junaid amjad

Used 1+ times

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

You are involved in testing a system in the medical domain. Testing needs to comply with the FDA requirements and is rated as being safety critical. A product risk assessment has been performed and various mitigation actions have been identified. Reliability testing is one of the test types that needs to be performed throughout the development lifecycle.
Based on the information provided, which of the following activities would need to be addressed in the test plan?

  • Perform a vulnerability scan.


  • Design and execution of specific tests that evaluate the software’s tolerance to faults in terms of handling unexpected input values.


Design and execution of test cases for scalability.

Testing whether the installation/de-installation can be completed.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The following characteristics were identified during an early product risk-assessment for a software system:
• the software system needs to manage synchronization between various processes
• microcontrollers will be used that will limit product performance
• the hardware that will be used will make use of timeslots
• the number of tasks supported in parallel by the software system is large and are often highly complex.
Based on the information provided, which of the following non-functional test types is MOST appropriate to be performed?

  • Maintainability testing

  • Security testing

  • Time-behaviour testing

  • Portability testing

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A major Caribbean bank typically develops their own banking software using an Agile methodology. However, for some specific components COTS software is acquired and used. The bank does not want to create a dependency on any external COTS supplier.
As part of the test approach, portability testing will be performed. Which portability sub-characteristic is especially relevant for the Caribbean bank?

Installability

Adaptability

Replaceability

  • Co-existence

Reveal Solution

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following does NOT contribute to a more effective review preparation by the Technical Test Analyst?


.Ensure that participants spend enough time during preparation, e.g., by managing checking rate (number of pages checked per hour during review preparation).

Managing logging rate (number of defects logged per minute during the meeting).

The usage of review checklists.

Review training for the Technical Test Analyst.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A product risk assessment has revealed the following product risks:
• lack of usability requirements
• security during on-line transactions
• perceived performance of the system and response time from the user interface
• a required availability of almost 100%
To address the 4th risk, which of the following quality characteristics for technical testing should be part of the test approach?

Adaptability

Reliability

Portability

Compatibility

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following reasons can be given for including co-existence testing in a test approach?

An application is intended to be operated on different platforms

Several changes are planned to an application’s code modules. Changes to one module should have an impact on other modules

More than one unrelated application is to be deployed on the same environment

The usage of system resources must be measured against a predefined benchmark

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A new business application is being developed for deployment on a Windows-based platform. If the application is successful there are plans for deployment to other platforms.

Which of the following quality characteristics should be given priority in the test approach?

Installability

Adaptability

Replaceability

Co-existence

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?