Testing and Decommissioning

Testing and Decommissioning

12th Grade

10 Qs

quiz-placeholder

Similar activities

Hot Water Systems RECAP

Hot Water Systems RECAP

12th Grade - University

15 Qs

Maintenance Indicators

Maintenance Indicators

12th Grade

15 Qs

AC 2.1 part 2 Water System Quiz

AC 2.1 part 2 Water System Quiz

12th Grade

10 Qs

H&S Quick Quiz 3 5357 001

H&S Quick Quiz 3 5357 001

12th Grade

10 Qs

AC 2.2 Cold Water Supply Systems in the UK

AC 2.2 Cold Water Supply Systems in the UK

12th Grade

15 Qs

Understanding Water Supply and Systems

Understanding Water Supply and Systems

12th Grade

15 Qs

BSE PPT 5 Commercial/Industrial  Quiz

BSE PPT 5 Commercial/Industrial Quiz

12th Grade

15 Qs

Domestic Cold-Water Supply Systems

Domestic Cold-Water Supply Systems

12th Grade

14 Qs

Testing and Decommissioning

Testing and Decommissioning

Assessment

Quiz

Construction

12th Grade

Hard

Created by

Bruce Kennish

Used 1+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The first step in soundness testing of rigid pipes is:

Visual inspection

Hydrostatic testing

Ultrasonic testing

Pressure testing

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

After filling the system with water, you should:

Check for leaks

Start the engine

Drain the water

Add more water

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fill in the blank: Pump system up to 1.5 times the _______ pressure.

maximum

minimum

average

standard

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done if there is a pressure drop during testing?

Increase the pressure immediately

Stop the test and check for leaks

Ignore the pressure drop

Continue testing at lower pressure

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the soundness testing of plastic pipes (polybutylene)?

Pump system to 1bar

Slowly fill the system with water

Increase pressure to 1.5 times working pressure

Walk around system and check for leaks

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During Test B, after how many minutes should you inspect the pressure loss initially?

15 minutes

30 minutes

60 minutes

120 minutes

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fill in the blank: After re-filling the system, open the kitchen tap and allow water to run until clear of ________.

debris/colour

air bubbles

rust

sediment

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?