Testing and Decommissioning

Testing and Decommissioning

12th Grade

10 Qs

quiz-placeholder

Similar activities

Planer Safety Test - Test #2

Planer Safety Test - Test #2

9th Grade - University

13 Qs

Construction for Machine Operation Safety Test 2024

Construction for Machine Operation Safety Test 2024

9th - 12th Grade

13 Qs

Jointer Safety Test - Test #3

Jointer Safety Test - Test #3

9th - 12th Grade

13 Qs

Electrical Safety

Electrical Safety

12th Grade

6 Qs

Refrigeration Systems Quiz

Refrigeration Systems Quiz

12th Grade

8 Qs

Methods of Heat Transfer Quiz

Methods of Heat Transfer Quiz

12th Grade

14 Qs

8710_350_uko2_ppt_2 T-Level Building Materials and Design Quiz

8710_350_uko2_ppt_2 T-Level Building Materials and Design Quiz

12th Grade

15 Qs

Skid-Steer Loader Operation and Safety

Skid-Steer Loader Operation and Safety

12th Grade

15 Qs

Testing and Decommissioning

Testing and Decommissioning

Assessment

Quiz

Construction

12th Grade

Hard

Created by

Bruce Kennish

Used 1+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The first step in soundness testing of rigid pipes is:

Visual inspection

Hydrostatic testing

Ultrasonic testing

Pressure testing

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

After filling the system with water, you should:

Check for leaks

Start the engine

Drain the water

Add more water

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fill in the blank: Pump system up to 1.5 times the _______ pressure.

maximum

minimum

average

standard

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done if there is a pressure drop during testing?

Increase the pressure immediately

Stop the test and check for leaks

Ignore the pressure drop

Continue testing at lower pressure

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the soundness testing of plastic pipes (polybutylene)?

Pump system to 1bar

Slowly fill the system with water

Increase pressure to 1.5 times working pressure

Walk around system and check for leaks

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During Test B, after how many minutes should you inspect the pressure loss initially?

15 minutes

30 minutes

60 minutes

120 minutes

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fill in the blank: After re-filling the system, open the kitchen tap and allow water to run until clear of ________.

debris/colour

air bubbles

rust

sediment

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?