Project Scheduling

Project Scheduling

University

10 Qs

quiz-placeholder

Similar activities

[WEEK 9] LET'S SQUEEZE THE QUIZ

[WEEK 9] LET'S SQUEEZE THE QUIZ

University

10 Qs

DCB30122 QUIZ

DCB30122 QUIZ

University

15 Qs

ORGANISASI PROYEK

ORGANISASI PROYEK

University

10 Qs

Basic Concepts and Formatting & Printing

Basic Concepts and Formatting & Printing

University

10 Qs

Project/Maintenance Management Q2

Project/Maintenance Management Q2

University

5 Qs

Project Delivery Methods and Contracts

Project Delivery Methods and Contracts

University

10 Qs

Construction Technology Test Week 1-6

Construction Technology Test Week 1-6

University

10 Qs

Risk, Documents, Specifications, EIA

Risk, Documents, Specifications, EIA

University

10 Qs

Project Scheduling

Project Scheduling

Assessment

Quiz

Construction

University

Hard

Created by

Omar Mostafa

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in project scheduling?

Estimate activity duration

Determine the activities

Draw the network diagram

Perform critical path analysis

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the formula used to estimate activity duration under normal conditions?

Duration = Quantity of work × Production rate

Duration = Quantity of work ÷ (Production rate × Number of crews)

Duration = (Optimistic + 4 × Most Likely + Pessimistic) ÷ 6

Duration = Total float × Free float

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main purpose of the Critical Path Method (CPM)?

To determine the shortest project duration

To track financial expenditures

To allocate project resources

To calculate the probability of project completion

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does a dummy activity in a network diagram represent?

An extra task that must be completed

A fictitious activity to maintain logical relationships

An activity with the longest duration

A critical path activity

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In project scheduling, which method is used to account for uncertainty in activity duration?

Critical Path Method (CPM)

Precedence Diagram Method (PDM)

Program Evaluation and Review Technique (PERT)

Line of Balance (LOB)

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the formula to calculate the expected activity duration (E) in PERT?

E = (O+4M+P)​/6

E = (P−O)/6

E = (LS−ES)/D

E = (LF−EF)/D

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which type of network diagram places activities on nodes rather than arrows?

Activity on Arrow (AOA)

Activity on Node (AON)

Gantt Chart

Line of Balance

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?