Immediately after nailing the plywood sheathing on a roof frame, you should install .
Plywood clips
A felt underlayment
A drip edge
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The length of a common rafter for a 20′-wide building with a 10″ rise per foot of run is .
20′
14′-8″
13′
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A rafter support that parallels the top plate and the ridgeboard is known as a .
Strongback
Purlin
Ridgeboard
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The number of sheets of plywood sheathing needed for a house 30' long with a span of 24' and with 8'' rise per foot of run is . (Assume no overhang.)
14
26
28
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The roof run measurement is usually equal to .
The distance from the top plate to the ridgeboard
The length of a common rafter
Half the span
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When placing underlayment over sheathing for roofs with a slope of 4'' or less, the commonly used roofer's felt is . A. 22 pound B. 15 pound C. 18 pound D. 10 pound
22 pound
18 pound
10 pound
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The rise per foot of run of a roof with a pitch of is . A. 6'' B. 12'' C. 18'' D. 24''
18''
24''
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?