Constant Rate Word Problems

Constant Rate Word Problems

8th Grade

20 Qs

quiz-placeholder

Similar activities

Unit Rate of graphs and word problems

Unit Rate of graphs and word problems

8th Grade

16 Qs

Slope and Unit Rate

Slope and Unit Rate

8th Grade - University

20 Qs

U2 - Mid-Unit Assessment Review

U2 - Mid-Unit Assessment Review

6th - 8th Grade

21 Qs

UNIT QUIZ - Unit Rates (Using and Comparing)

UNIT QUIZ - Unit Rates (Using and Comparing)

6th - 8th Grade

16 Qs

Constant Rate of Change

Constant Rate of Change

7th - 8th Grade

20 Qs

Linear Functions (A) Review

Linear Functions (A) Review

8th Grade

17 Qs

Rate of Change Practice

Rate of Change Practice

8th - 9th Grade

22 Qs

[YEAR 09 MATHEMATICS]: Wages and Salaries

[YEAR 09 MATHEMATICS]: Wages and Salaries

9th Grade

18 Qs

Constant Rate Word Problems

Constant Rate Word Problems

Assessment

Quiz

Mathematics

8th Grade

Hard

CCSS
HSF-BF.A.1A, HSA.CED.A.1, 8.F.B.4

+6

Standards-aligned

Created by

Anthony Clark

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Working alone at a constant rate, Carla can wash a load of dishes in 42 minutes. If Carla works together with Dan and they both work at constant rates, it takes them 28 minutes to wash the same load of dishes. Working at a constant rate, how long would it take Dan to wash the load of dishes by himself?

50 minutes

1 hour

84 minutes

2 hours

Tags

CCSS.HSA.CED.A.1

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Working alone, it takes Asanji eight hours to dig a 10 ft by 10 ft hole. Brenda can dig the same hole in nine hours. How long would it take them if they worked together?

2 hours

4 hours

4.24 hours

5 hours

Tags

CCSS.HSA.CED.A.1

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

It takes Kali eight minutes to sweep a porch. Shawna can sweep the same porch in 11 minutes. If they worked together how long would it take them?

4.63 minutes

8 minutes

5.34 hours

6 minutes

Tags

CCSS.HSA.CED.A.1

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

It takes Heather seven hours to pour a large concrete driveway. Alberto can pour the same driveway in eight hours. How long would it take them if they worked together?

1 hour

2.37 hours

3.73 hours

4 hours

Tags

CCSS.HSA.CED.A.1

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Media Image

A

B

C

D

Tags

CCSS.HSF-BF.A.1A

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Media Image

A

B

C

D

Tags

CCSS.HSF-BF.A.1A

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A candlestick burns at a rate of .2 inches per hour.  After 8 hours the candlestick is 13.4 inches tall. 
Find the original height of the candle.

15 inches

15.6 inches

14.8 inches

16 inches

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?