Cold Water Quiz 1'

Cold Water Quiz 1'

21 Qs

quiz-placeholder

Similar activities

Rod-and-Tube and Snap Disc Controls Quiz

Rod-and-Tube and Snap Disc Controls Quiz

12th Grade

20 Qs

Plant System Quiz

Plant System Quiz

7th Grade

20 Qs

5.7 Matter phases and changes

5.7 Matter phases and changes

KG - University

20 Qs

Progress Overtime Phase 2

Progress Overtime Phase 2

KG - University

20 Qs

BI 7 Weather Earth Science ORE Vocab

BI 7 Weather Earth Science ORE Vocab

5th Grade

17 Qs

Product training mobile crane

Product training mobile crane

KG - University

19 Qs

7202 unit 103 End of unit revision

7202 unit 103 End of unit revision

KG - University

20 Qs

Cold Water Quiz 1'

Cold Water Quiz 1'

Assessment

Quiz

others

Easy

Created by

Richard Hodgett

Used 1+ times

FREE Resource

21 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When installing a new indirect cold water system, which of the following should happen, according to the Water Regulations?
One tap, normally the kitchen sink, should be drawn directly from the supply pipe
One tap, normally the kitchen sink, should have a dedicated distribution pipe from the storage cistern
Mixer taps will require double check valves
Mixer taps should never be installed due to the pressure differences.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to BS6700 and the Water Regulations, a drain off valve should be installed:
At every draw off point
At every high point in the system
At every low point in the system
Above the cold water storage cistern.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Pin holing in copper pipework is commonly caused by:
Hard water
Acidic water
Alkaline water
Pure water.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

While installing pipework in a property, you are called off site to another job. What would be the correct course of action with any open-ended pipework?
Place a warning label on every open end
Cap off with a push fit fitting
Warn the customer not to interfere with any pipework
Be as quick as you can to return.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

One of the major problems when leaving a dead leg in a cold water pipe is:
Electrolytic corrosion
Pitting of pipework
Reduction in water flow
Possible bacterial growth.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The use of WRAS approved fittings when installing cold water pipework is:
A legal requirement
To be corrosion resistant
To avoid contamination
All of the above.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

On the completion of a new cold water installation, the system has been proven sound. What would the next course of action be?
Visual inspection with the customer
Flush the pipework out then hand over to the customer
Prepare the benchmark certificate
Hand over to the customer.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?