Construction Management Principles

Construction Management Principles

University

7 Qs

quiz-placeholder

Similar activities

Wood Finishing Techniques and Characteristics

Wood Finishing Techniques and Characteristics

9th Grade - University

10 Qs

Quiz on BedZED: Pioneering Sustainable Community Living

Quiz on BedZED: Pioneering Sustainable Community Living

University

9 Qs

Sistem Irigasi

Sistem Irigasi

University

7 Qs

Risk, Documents, Specifications, EIA

Risk, Documents, Specifications, EIA

University

10 Qs

CBE207 W1

CBE207 W1

University

10 Qs

Basic Concepts and Formatting & Printing

Basic Concepts and Formatting & Printing

University

10 Qs

Construction quiz 101 Qizz 1

Construction quiz 101 Qizz 1

11th Grade - University

5 Qs

ACT Retaining Structures, Groundwater, Commercial Frame Building

ACT Retaining Structures, Groundwater, Commercial Frame Building

University

10 Qs

Construction Management Principles

Construction Management Principles

Assessment

Quiz

Construction

University

Medium

Created by

Emma Coyle

Used 2+ times

FREE Resource

7 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Select all items below that are included in the "triple constraint" or "triple bottom line" in relation to construction project management.

Time

Overheads

Quality

Resources

Cost

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What percentage of Ireland's overall GHG emissions is the built environment estimated to account for?

10%

>30%

20%

<30%

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main role of a client in a construction project?

Delivering the project in accordance with the contract and any applicable standards.

Preparing the design and doing inspections on the design

Defining the project, procuring designer / contractor and paying for the works

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the term for the process of obtaining the goods and services a company needs to support its daily operations?

Acquisition

Logistics

Procurement

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The priorities of the Client, Designer and Contractor in relation to the "triple constraint" are always the same?

True

False

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the name for a contractor who delivers part of a construction project on behalf of a bigger company?

Main Contractor

Sub Contractor

Sole Contractor

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT typically a responsibility of a contractor?

Delivering the project in accordance with the contract.

Identifying and mitigating hazards on the construction site.

Defining the project brief and securing funding.