93 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the primary goal during the start-up phase of a distillation unit?
Ensure steady-state operation.
Increase temperature rapidly.
Maintain constant reflux ratio.
Stop feed flow intermittently.
Operate without monitoring pressure.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
During the start-up of a catalytic cracker, why is it essential to preheat the catalyst bed?
To achieve the required reaction temperature.
To cool down the system.
To remove contaminants.
To increase feedstock viscosity.
To promote rapid shutdown.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why is inert gas used during the initial phase of starting oil refining equipment?
To prevent explosion due to residual hydrocarbons.
To increase oxygen concentration.
To accelerate reaction rates.
To reduce feedstock flow rate.
To enhance fouling of heat exchangers.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the correct sequence for starting a hydrotreater?
Purging → Catalyst activation → Feed introduction.
Feed introduction → Purging → Cooling.
Heating → Feedstock mixing → Shutdown.
Cooling → Product collection → Catalyst regeneration.
Steam purging → Cooling → Final adjustment.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the critical parameter to monitor during the start-up of a thermal cracking unit?
Furnace temperature.
Product storage capacity.
Maintenance schedule.
Laboratory test results.
Feed temperature.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the first step in shutting down a distillation column?
Stop the feed flow.
Turn off the reboiler.
Disconnect utility lines.
Isolate the reflux drum.
Drain the column contents.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In a gas compressor system, what should be done to prevent backflow during shutdown?
Close the discharge valve immediately.
Open the suction valve completely.
Increase compressor speed briefly.
Shut down without adjusting valves.
Flush the system with water.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
93 questions
10th Grade Vocabulary Practice
Quiz
•
10th Grade - University
88 questions
G10-U5-AMBITIONS
Quiz
•
10th Grade - University
95 questions
Black Ships Ch. 1-10
Quiz
•
7th Grade - University
89 questions
Quiz Teknik Tenaga Listrik - TMPP
Quiz
•
University
90 questions
5S1 - LESSON 21. WRITING PRACTICE 3 (17/9)
Quiz
•
6th Grade - University
98 questions
BAHASA INGGRIS KELAS 9 (REPORT TEXT , PASSIVE VOICE)
Quiz
•
9th Grade - University
92 questions
ĐỀ CƯƠNG CUỐI KHÓA 2022-2023
Quiz
•
University
90 questions
IOE TRƯỜNG 7
Quiz
•
3rd Grade - University
Popular Resources on Wayground
7 questions
History of Valentine's Day
Interactive video
•
4th Grade
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
22 questions
fractions
Quiz
•
3rd Grade
15 questions
Valentine's Day Trivia
Quiz
•
3rd Grade
20 questions
Main Idea and Details
Quiz
•
5th Grade
20 questions
Context Clues
Quiz
•
6th Grade
Discover more resources for English
12 questions
IREAD Week 4 - Review
Quiz
•
3rd Grade - University
23 questions
Subject Verb Agreement
Quiz
•
9th Grade - University
10 questions
THEME
Quiz
•
KG - University
13 questions
Jobs in the Theater
Quiz
•
6th Grade - University
12 questions
Charlie and the Chocolate Factory Chapters 21-30
Quiz
•
2nd Grade - University
20 questions
Context Clues
Quiz
•
KG - University