Bored Pile Foundation Quiz

Bored Pile Foundation Quiz

12th Grade

18 Qs

quiz-placeholder

Similar activities

Day 53 worksheet lsgd SANITARY FITTINGS , Ed

Day 53 worksheet lsgd SANITARY FITTINGS , Ed

1st Grade - University

15 Qs

DAY 35 WORKSHEET LSGD (Bridge Engineering)

DAY 35 WORKSHEET LSGD (Bridge Engineering)

1st Grade - University

15 Qs

Manufacturing Processes Quiz

Manufacturing Processes Quiz

8th Grade - University

20 Qs

Mechanical Advantage and Machine Design Quiz

Mechanical Advantage and Machine Design Quiz

7th Grade - University

16 Qs

Quiz on Safety and Design

Quiz on Safety and Design

9th Grade - University

15 Qs

Engineering Ethics Test

Engineering Ethics Test

9th - 12th Grade

20 Qs

Mechanical System Components Quiz

Mechanical System Components Quiz

12th Grade - University

14 Qs

12SEN Software Automation terms

12SEN Software Automation terms

12th Grade - University

20 Qs

Bored Pile Foundation Quiz

Bored Pile Foundation Quiz

Assessment

Quiz

Engineering

12th Grade

Practice Problem

Hard

Created by

Navid Mehreganian

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

18 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why are bored piles popular in urban areas?

They are cost-effective

They require minimal vibration

They are easy to transport

They are environmentally friendly

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is inserted into the drilled hole before the pile is poured?

A wooden frame

A temporary steel cylinder

A plastic tube

A concrete block

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the bored pile construction process?

Pouring concrete

Drilling a vertical hole

Inserting a rebar cage

Capping the pile

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first stage in bored pile construction?

Insert reinforcement

Drilling

Cast concrete

Finished pile

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it advised to have bored piling work performed by a specialized contractor?

It is cheaper

It requires extensive knowledge and experience

It is faster

It is less labor-intensive

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a common challenge with drilling on cohesionless soil?

It is too easy

It causes a mess

It is faster

It requires less equipment

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the third stage in bored pile construction?

Drilling

Insert reinforcement

Cast concrete

Finished pile

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?