1031 Canal Hardrock Building Collapse - Document Questions
Authored by Shawn Hill
Professional Development
University
Used 1+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
15 mins • 10 pts
What was the intended name of the project if the 1031 Canal building was completed?
Canal Street Plaza
New Orleans Tower
Louisiana High-Rise
Hard Rock Hotel New Orleans
2.
MULTIPLE CHOICE QUESTION
15 mins • 10 pts
On what date did the 1031 Canal building partially collapse?
April 3, 2020
October 12, 2019
January 15, 2020
September 22, 2011
3.
MULTIPLE CHOICE QUESTION
15 mins • 10 pts
Who was the architect for the 1031 Canal project?
Edward Michel
Heaslip Engineering, LLC
Mohan Kailas
Harry Baker Smith Architects II
4.
MULTIPLE CHOICE QUESTION
15 mins • 10 pts
What was the original structure at the 1031 Canal location?
A Woolworth store
A parking garage
A hotel
An office building
5.
MULTIPLE CHOICE QUESTION
15 mins • 10 pts
What did OSHA find regarding the structural engineer's role in the collapse?
Failed to adequately design, review or approve steel bolt connections
Did not conduct site inspections
Used substandard materials
Ignored safety warnings
6.
MULTIPLE CHOICE QUESTION
15 mins • 10 pts
How many workers died as a result of the 1031 Canal building collapse?
Four
Five
Three
Two
7.
MULTIPLE CHOICE QUESTION
15 mins • 10 pts
What was the proposed number of hotel rooms in the Hard Rock Hotel plan?
350
250
400
300
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?