Construction Drawing Quiz 102 A

Construction Drawing Quiz 102 A

12th Grade

20 Qs

quiz-placeholder

Similar activities

Construction Knowledge Quiz

Construction Knowledge Quiz

12th Grade

25 Qs

Unit 103

Unit 103

12th Grade

20 Qs

Construction Waste Management Quiz

Construction Waste Management Quiz

12th Grade - University

15 Qs

1 - General Shop / Tool Safety 2024

1 - General Shop / Tool Safety 2024

9th - 12th Grade

15 Qs

Hot Water Systems RECAP

Hot Water Systems RECAP

12th Grade - University

15 Qs

Construction Trades Quiz

Construction Trades Quiz

12th Grade

15 Qs

Resistor Color Code Quiz

Resistor Color Code Quiz

9th - 12th Grade

20 Qs

MATERIAL SCIENCE

MATERIAL SCIENCE

12th Grade

15 Qs

Construction Drawing Quiz 102 A

Construction Drawing Quiz 102 A

Assessment

Quiz

Construction

12th Grade

Hard

Created by

John North

Used 18+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What drawing should be used to show the external horizontal dimensions of a garage?

Front elevation.

Location plan.

Plan view.

Section through.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which scale is commonly used for elevation drawings?

1:5

1:100

1:250

1:2500

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which item of equipment would be used to measure angles when producing drawings?

Protractor.

Scale rule.

T square.

Set square.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What colour on a drawing identifies underground cold water supply pipes?

Green.

Blue.

Red.

Black.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which task should be completed before setting out a building?

Remove the topsoil.

Inform the builder’s merchants.

Order the ready mix concrete.

Check the site is level.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which method is used to check the building is square when setting out?

Check the external dimensions.

Check the internal dimensions.

Check the diagonal lengths.

Check the position of the profiles.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is the 3: 4: 5 method used when setting out?

To check the depth of excavation.

To keep the trench level.

To establish the right angles.

To form a profile board.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?