SP 2: GT Materials & Damage Mechanisms

SP 2: GT Materials & Damage Mechanisms

University

10 Qs

quiz-placeholder

Similar activities

FOV Chapter 11

FOV Chapter 11

University

10 Qs

 Unit 2

Unit 2

University

14 Qs

Post Assessment 3 (Part 1)

Post Assessment 3 (Part 1)

University

15 Qs

READING: Authors' Writing Pattern

READING: Authors' Writing Pattern

University

10 Qs

Material Review 1

Material Review 1

University

15 Qs

Questions about Tet

Questions about Tet

University

15 Qs

TOEFL Review of Skill 3 Present Participle

TOEFL Review of Skill 3 Present Participle

University

10 Qs

Vocabulary - Relationships

Vocabulary - Relationships

5th Grade - University

10 Qs

SP 2: GT Materials & Damage Mechanisms

SP 2: GT Materials & Damage Mechanisms

Assessment

Quiz

English

University

Hard

Created by

tnbgenco. talent

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the highest thermal efficiency of the latest Simple Cycle & Combined Cycle GT power plant?

~25% & ~30%

~30% & ~40%

~35% & ~50%

~44% & ~64%

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Name the component of the rotating section in a gas turbine which experienced highest temperature.

Combustor

Turbine

Compressors

Exhaust

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Based on the thermal cycle, name two (2) parameters that will determine the thermal efficiency of a gas turbine.

Turbine inlet temperature & exhaust temperature

Compressor pressure ratio & turbine inlet temperature

Combustor temperature & compressor inlet temperature

Compressor pressure ratio & compressor inlet temperature

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a gas turbine which components experience the highest temperature and stress?

Stage 1 turbine rotating blade

Stage 1 compressor blade

Stage 5 compressor blade

Stage 1 turbine stationary vane

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select types of inspection interval calculations (formula) used by certain OEMs to determine the maintenance cycles.

Equivalent Operating Hours (EOH)

Factored Fired Hours (FFH) and Factored Starts (FS)

Equivalent Based Hours (EBH) and Equivalent Starts (ES)

All above

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select the correct sequence of inspections and approximate durations to perform the work scopes on a GE Frame 6B gas turbine.

Hot Gas Path Inspection (7 days), Combustion Inspection (14 days) and Major Inspection (30 days)

Combustion Inspection (7days), Hot Gas Path Inspection (14 days) and Major Inspection (30 days)

Combustion Inspection (14 days), Hot Gas Path Inspection (7 days) and Major Inspection (30 days)

Major Inspection (14 days), Combustion Inspection (7 days) and Hot Gas Path Inspection (30 days)

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Below are among the important properties of a superalloy used in gas turbine.

High temperature strength and low oxidation resistance

High temperature strength and high oxidation resistance

High fatigue cracking resistance

a & c

b & c

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?