cold water 1

cold water 1

2nd - 5th Grade

69 Qs

quiz-placeholder

Similar activities

2nd Grade Quiz

2nd Grade Quiz

2nd Grade

69 Qs

Weather Review

Weather Review

5th Grade

67 Qs

school 2

school 2

5th - 8th Grade

73 Qs

India Map

India Map

5th Grade

72 Qs

Science Practice Test

Science Practice Test

3rd Grade

68 Qs

4TH QUARTER LONG QUIZ GRADE 4

4TH QUARTER LONG QUIZ GRADE 4

4th Grade

65 Qs

Food

Food

4th Grade

70 Qs

Unit II Review - "Studying The Earth's Atmosphere"

Unit II Review - "Studying The Earth's Atmosphere"

KG - University

64 Qs

cold water 1

cold water 1

Assessment

Quiz

Other

2nd - 5th Grade

Hard

Created by

romin gouran

Used 3+ times

FREE Resource

69 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A commissioning report would include which of the following?

Invoice, address and final comments

Chlorination figures, discharge rates and duration of test pressures

Service plan, comments on job, manufacturer’s instructions

Duration of job, list of test techniques, extra costs incurred

Answer explanation

A commissioning report focuses on operational data, making 'Chlorination figures, discharge rates and duration of test pressures' the correct choice, as it details system performance and compliance.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The building control officer should be notified at which stage of a job?

After

The beginning

During

Before it begins

Answer explanation

The building control officer should be notified before the job begins to ensure compliance with regulations and to address any necessary permits or inspections early in the process.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Local Authority should be notified in which of the situations listed below?

When private water supplies are concerned

When a connection is made to an undertakers supply

After commissioning

Before commencing any work relating to a building

Answer explanation

The Local Authority must be notified when private water supplies are concerned to ensure safety and compliance with regulations. This is crucial for monitoring and managing water quality.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is shown?

Water Softener

Reverse Osmosis Machine

Water Booster Pump

Power Flusher

Answer explanation

The image depicts a Water Booster Pump, which is designed to increase water pressure in a plumbing system. This distinguishes it from a water softener, reverse osmosis machine, or power flusher, which serve different functions.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A combination bath shower mixer would require which type of protection?

HC

DC

AUK3

DCV

Answer explanation

A combination bath shower mixer requires HC (High Capacity) protection to ensure safe operation and prevent backflow, making it the correct choice over the other options.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A charge in an accumulator is usually less that the operating pressure in a cold water system by how much?

10 bar

1.5 bar

2.5 bar

5 bar

Answer explanation

In a cold water system, the charge in an accumulator is typically set to be 1.5 bar less than the operating pressure. This ensures proper system functionality and efficiency, making 1.5 bar the correct choice.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a job has been interrupted and the pipework is to be uncommissioned, what must the plumber do?

Attach Sure-STOPs to every open end.

Cap off all open ends except primaries

All open ends must be capped off

Don't start the work unless you an finish in the same day

Answer explanation

Capping off all open ends is essential to prevent leaks and ensure safety when uncommissioning pipework. This choice ensures that no open ends are left exposed, which could lead to potential hazards.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?