Lec 17 STM3633 sem 1 24-25 11.12.24

Lec 17 STM3633 sem 1 24-25 11.12.24

University

10 Qs

quiz-placeholder

Similar activities

FUNDAMENTO DE PROGRAMACIÓN - PRUEBA DIAGNOSTICA

FUNDAMENTO DE PROGRAMACIÓN - PRUEBA DIAGNOSTICA

University

10 Qs

Formative 6 - Software Quality

Formative 6 - Software Quality

University

10 Qs

Quiz on Variables and Charts

Quiz on Variables and Charts

University

13 Qs

CH06-Sequential Circuits

CH06-Sequential Circuits

University

12 Qs

MM-Intro

MM-Intro

University

10 Qs

Power Point Presentation Chapter 3

Power Point Presentation Chapter 3

4th Grade - University

8 Qs

Use of Statistics in Data Science

Use of Statistics in Data Science

10th Grade - University

10 Qs

Tipos de Sistemas Automáticos

Tipos de Sistemas Automáticos

8th Grade - University

8 Qs

Lec 17 STM3633 sem 1 24-25 11.12.24

Lec 17 STM3633 sem 1 24-25 11.12.24

Assessment

Quiz

Information Technology (IT)

University

Medium

Created by

MOHAMAD ZAINOL

Used 25+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

yhkmdgmyh

Encrypted message
Valid password
User input data
Random string

2.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

An assignable cause of variation in Statistical Process Control (SPC) is:

A natural, random fluctuation

A predictable pattern of variation

A specific, identifiable factor

human observation errors

3.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

A common cause of variation in SPC?

predictable and consistent.

natural, random variation

sudden and unpredictable

external environmental factors.

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The primary purpose of using a control chart in the Control phase of DMAIC is:

To eliminate all forms of variation

identify and monitor variation

calculate the total output

increase production speed

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The purpose of using a Fishbone (Ishikawa) diagram in DMAIC is:

display process performance

rank defects

calculate process capability

identify the root causes

6.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

the main difference between Inspection and Statistical Process Control (SPC) is

Reactive vs Proactive

Detect vs Control

Product vs Process

After vs Before

7.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Which of the following is NOT one of the 7 basic tools of Statistical Process Control (SPC)?

Control Chart

Fishbone Diagram

Histogram

Gantt Chart

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?