Cold water Power point 5 6035

Cold water Power point 5 6035

Professional Development

15 Qs

quiz-placeholder

Similar activities

Requirements for System Types

Requirements for System Types

Professional Development

20 Qs

Cold Water Systems LO5

Cold Water Systems LO5

Professional Development

10 Qs

Level 3 Plumbing and Domestic Heating-Unit 301H&S Systems

Level 3 Plumbing and Domestic Heating-Unit 301H&S Systems

Professional Development

20 Qs

Week 1 MMB Review

Week 1 MMB Review

Professional Development

10 Qs

Air Supplies

Air Supplies

Professional Development

10 Qs

Level 3 phase 1 central heating questions

Level 3 phase 1 central heating questions

Professional Development

10 Qs

M4Q3

M4Q3

Professional Development

10 Qs

HAC101 Week 7 Quiz Evaporators

HAC101 Week 7 Quiz Evaporators

Professional Development

20 Qs

Cold water Power point 5 6035

Cold water Power point 5 6035

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

Gary Jones

Used 2+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a requirement for a plumbing system after installation?

It must be sound.

It must be flushed through.

It must be painted.

It must be commissioned.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a necessary step after installing pipework?

Painting

Flushing through

Insulating

Expanding

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step before carrying out a soundness test?

Measure the pipe length

Walk around the system

Check the water flow

Inspect the pipe color

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the soundness test?

To check for leaks

To measure pipe length

To assess water quality

To evaluate pipe color

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in soundness testing for rigid pipes?

Attach the hydraulic test bucket

Walk around the system and check for leaks

Slowly fill the system with water

Pump system up to 1.5 x working pressure

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How long should you wait after pumping the system to 1bar before checking for pressure loss?

15 minutes

30 minutes

45 minutes

60 minutes

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the significance of maintaining pressure for a specific time during the test?

To ensure system stability

To check for leaks

To allow for pressure loss detection

To fill the system with water

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Professional Development