Plumbing Processes and Techniques

Plumbing Processes and Techniques

12th Grade

11 Qs

quiz-placeholder

Similar activities

Scratch Coat Render

Scratch Coat Render

11th - 12th Grade

8 Qs

Introduction to Electrical Circuits (Electrical L1) Quiz

Introduction to Electrical Circuits (Electrical L1) Quiz

12th Grade

15 Qs

Primary and Secondary Processes Quiz

Primary and Secondary Processes Quiz

9th Grade - University

10 Qs

Electricity Basics

Electricity Basics

12th Grade

11 Qs

6072-51 LO1 Identifying Hazards

6072-51 LO1 Identifying Hazards

12th Grade

12 Qs

Legislation and Standards

Legislation and Standards

12th Grade

15 Qs

Occupational Overview (Electrical L1) Quiz

Occupational Overview (Electrical L1) Quiz

12th Grade

10 Qs

The Owl Project

The Owl Project

8th Grade - University

15 Qs

Plumbing Processes and Techniques

Plumbing Processes and Techniques

Assessment

Quiz

Construction

12th Grade

Hard

Created by

Scott Lincoln

FREE Resource

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum depth of a notch that can be made in a joist that is 200mm deep?

25mm

50mm

175mm

200mm

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum distance from the wall that a notch can be placed?

25mm

175mm

200mm

50mm

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What size is the largest permissible drilled hole in a joist that is 200mm deep?

50mm

25mm

175mm

200mm

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where in the joist can the hole be drilled?

On the centre line of the joist only

Anywhere in the joist

At the ends of the joist

Near the supporting structure

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How close together can drilled holes be placed?

Holes should be no closer together than three times their diameter

Holes can be placed anywhere

Holes should be placed at least 10mm apart

Holes should be placed at least 5mm apart

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done to protect pipework laid in floors and across joists?

Covered with lagging

Left exposed

Painted

Wrapped in plastic

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a materials requisition system?

To book materials out of the stores

To store materials

To deliver materials

To monitor stock levels

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?