Production Control: Lean System

Quiz
•
Engineering
•
12th Grade
•
Medium
DR. (PUO)
Used 3+ times
FREE Resource
8 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
20 sec • 2 pts
What is the primary focus of lean systems in production control?
Reducing employee workload
Increasing production speed
Achieving stable, level daily mix schedules
Maximizing inventory levels
2.
MULTIPLE CHOICE QUESTION
20 sec • 2 pts
In the context of Manufacturing Planning and Control (MPC), what does 'level loading' refer to?
Uneven distribution of work
Equal loading of jobs on available resources
Maximizing production output
Minimizing employee hours
3.
MULTIPLE CHOICE QUESTION
20 sec • 2 pts
What is a Heijunka box used for?
To calculate production costs
To manage inventory levels
To implement level loading in production
To track employee attendance
4.
MULTIPLE CHOICE QUESTION
20 sec • 2 pts
Which of the following is a benefit of using four cycles in production planning?
Increased production time
Higher inventory levels
Fewer changeovers
More flexibility and lower inventory
5.
MULTIPLE CHOICE QUESTION
20 sec • 2 pts
What does a production kanban signal?
The need to produce parts
The need to increase production speed
The need to reduce inventory
The need to deliver parts
6.
MULTIPLE CHOICE QUESTION
20 sec • 2 pts
How is the number of repetitions for a cycle calculated?
By dividing daily requirements by the number of cycles
By subtracting daily requirements from the number of cycles
By adding daily requirements to the number of cycles
By multiplying daily requirements by the number of cycles
7.
MULTIPLE CHOICE QUESTION
20 sec • 2 pts
What is the ideal number of kanban cards based on?
Daily production output and container capacity
Employee availability and production speed
Inventory levels and production costs
Market demand and supplier reliability
8.
MULTIPLE CHOICE QUESTION
20 sec • 2 pts
What is the purpose of a conveyance kanban?
To track production efficiency
To signal the need to deliver parts to the next work center
To signal the need to produce parts
To manage employee schedules
Similar Resources on Wayground
Popular Resources on Wayground
10 questions
Video Games

Quiz
•
6th - 12th Grade
20 questions
Brand Labels

Quiz
•
5th - 12th Grade
15 questions
Core 4 of Customer Service - Student Edition

Quiz
•
6th - 8th Grade
15 questions
What is Bullying?- Bullying Lesson Series 6-12

Lesson
•
11th Grade
25 questions
Multiplication Facts

Quiz
•
5th Grade
15 questions
Subtracting Integers

Quiz
•
7th Grade
22 questions
Adding Integers

Quiz
•
6th Grade
10 questions
Exploring Digital Citizenship Essentials

Interactive video
•
6th - 10th Grade
Discover more resources for Engineering
20 questions
Brand Labels

Quiz
•
5th - 12th Grade
10 questions
Video Games

Quiz
•
6th - 12th Grade
28 questions
Ser vs estar

Quiz
•
9th - 12th Grade
13 questions
BizInnovator Startup - Experience and Overview

Quiz
•
9th - 12th Grade
16 questions
AP Biology: Unit 1 Review (CED)

Quiz
•
9th - 12th Grade
20 questions
Parallel lines and transversals

Quiz
•
9th - 12th Grade
9 questions
Geometry and Trigonometry Concepts

Interactive video
•
9th - 12th Grade
10 questions
Angle Relationships with Parallel Lines and a Transversal

Quiz
•
9th - 12th Grade