Locating the Building Sewer and Building Drain

Locating the Building Sewer and Building Drain

10th Grade

37 Qs

quiz-placeholder

Similar activities

1301 Midterm Review 1 (Chapters 1-5)

1301 Midterm Review 1 (Chapters 1-5)

KG - University

35 Qs

Q3 Samsung Mock Certification - Set 2

Q3 Samsung Mock Certification - Set 2

KG - Professional Development

32 Qs

Infinitives with Interrogatives building new

Infinitives with Interrogatives building new

9th - 12th Grade

35 Qs

Cadet Field Manual Part 1 Quiz

Cadet Field Manual Part 1 Quiz

9th - 12th Grade

40 Qs

RESIDENTIAL FLOOR PLANS

RESIDENTIAL FLOOR PLANS

10th - 12th Grade

40 Qs

CM-Review 2

CM-Review 2

9th - 12th Grade

35 Qs

Syllabus Quiz 19-20

Syllabus Quiz 19-20

10th - 12th Grade

32 Qs

NS3 Quiz Yankee

NS3 Quiz Yankee

9th - 12th Grade

41 Qs

Locating the Building Sewer and Building Drain

Locating the Building Sewer and Building Drain

Assessment

Quiz

Other

10th Grade

Medium

Created by

Christopher Richard

Used 1+ times

FREE Resource

37 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a 'sleeve' in piping?

To reinforce concrete

To prevent pipes from being damaged by contact with concrete

To provide a base for the application of exterior cladding

To cover the exterior framing of a building.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In plumbing, the lowest point or the lowest inside surface of a channel, conduit, drain, pipe, or sewer pipe is known as the ________.

Benchmark

Invert elevation

Rebar

Sheathing

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of using rebar in plumbing installations?

To provide protection against movement

To increase water flow

To reduce installation time

To enhance aesthetic appeal.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fill in the blank: When verifying the layout for below-grade piping, you must locate all underground site utility lines. Use grade lines attached to _______ to establish the locations of the drains.

rebar

batter boards

chalk lines

sewer taps

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the total length of the building drain shown in the house floor plan?

27'-9"

16'-9"

41 inches

100 feet

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fill in the blank: The minimum depth required for the sewer tap from the finished floor of the basement is ___ inches.

25

16

41

100

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the importance of maintaining the proper grade in a plumbing system?

It prevents blockages and ensures proper flow.

It increases the cost of construction.

It reduces the need for maintenance.

It allows for larger pipe sizes.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?