1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

When the application for building permit and the plans and specifications submitted herewith conforms to the requirements of the Code and its IRR shall within ___ from the payment of the required fees by the applicant.

7 days

15 days

10 days

20 days

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

A building permit issued under the provisions of this Code (PD 1096) shall expire and become null and void if the building or work authorized therein is not commenced within a period of ____ from the date of such permit.

30 days

90 days

120 days

180 days

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The engineer or architect who drew up the plans and specifications for a building/structure is liable for damages if within ___ from the completion of the building/structure.

20 years

15 years

5 years

10 years

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

These types of buildings are made up of wood construction.

Type 1

Type 2

Type 3

Type 4

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

These types of buildings are made up of wood construction with protective fire-resistant materials and one-hour fire-resistive throughout the structure

Type 1

Type 2

Type 3

Type 4

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

These types of buildings shall be steel, iron, concrete, or masonry construction and walls, ceiling and permanent partitions shall be of incombustible fireresistive construction, except, that permanent nonbearing partitions of 1-hour fire-resistive construction may use fire-retardant treated wood within the framing assembly.

Type 1

Type 2

Type 3

Type 4

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

These types of buildings consist of masonry and wood construction.

Type 1

Type 2

Type 3

Type 5

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?