1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should you be able to do after completing Session One?
Identify boxes and fittings
Install electrical wiring
Design a circuit board
Repair household appliances
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which type of boxes should you be able to select in this session?
Pull and junction boxes
Fuse and switch boxes
Circuit and breaker boxes
Outlet and socket boxes
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is one of the tasks you should be able to perform regarding fittings?
Select and install fittings
Design new fittings
Manufacture fittings
Test electrical fittings
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of pull and junction boxes?
To store electrical tools
To provide pull points or make conductor connections
To decorate electrical rooms
To increase electrical voltage
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which NEC Article covers pull and junction box requirements?
NEC Article 210
NEC Article 314
NEC Article 110
NEC Article 430
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What must boxes for damp and wet locations be protected against?
Dust
Heat
Moisture
Cold
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does the first number in the IP classification system represent?
Degree of protection against water
Degree of protection against solid objects
Degree of protection against temperature
Degree of protection against chemicals
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?