unit 108 ppt 3 knowledge check

unit 108 ppt 3 knowledge check

12th Grade

14 Qs

quiz-placeholder

Similar activities

305 Cold water systems 3 Quiz

305 Cold water systems 3 Quiz

2nd Grade - University

18 Qs

306 Hot water systems 3 Quiz

306 Hot water systems 3 Quiz

2nd Grade - University

18 Qs

Hand Tools - Safety

Hand Tools - Safety

12th Grade

10 Qs

Construction Tools and Techniques

Construction Tools and Techniques

12th Grade

18 Qs

214 ppt 1 Water Supply and Management Quiz

214 ppt 1 Water Supply and Management Quiz

12th Grade

15 Qs

AC 2.44 Quiz on Full-Way Gate Valves

AC 2.44 Quiz on Full-Way Gate Valves

12th Grade

10 Qs

UNIT 109 PPT 3 KNOWLEDGE CHECK AND STARTER.

UNIT 109 PPT 3 KNOWLEDGE CHECK AND STARTER.

12th Grade - University

11 Qs

Plumbing Systems Decommissioning Quiz

Plumbing Systems Decommissioning Quiz

12th Grade - University

13 Qs

unit 108 ppt 3 knowledge check

unit 108 ppt 3 knowledge check

Assessment

Quiz

Construction

12th Grade

Hard

Created by

Gary Scott

FREE Resource

14 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a common type of waste pipe fitting?

Push-fit

Compression

Solvent weld

Threaded

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which waste pipe fitting is least likely to be used for permanent installations?

Push-fit

Compression

Solvent weld

Threaded

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What can burrs damage if not removed from waste pipe fittings?

The pipe color

The O-ring and seals

The pipe length

The pipe diameter

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What creates the water-tight seal on a push-fit fitting?

A rubber gasket

A silicone sealant

A neoprene O-ring

A metal clamp

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of marking the insertion depth on a waste pipe?

To ensure the pipe is the correct length

To indicate if the pipe has been pushed home

To identify the type of pipe

To make the pipe look neat

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in fitting a waste pipe?

Push the pipe into the fitting

Line the pipe up with the component

Tighten the O-ring

Mark the pipe with a pencil

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the significance of the pencil mark in waste pipe fittings?

It indicates full insertion

It marks the cutting point

It shows the pipe diameter

It identifies the pipe material

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?