Shingle Installation

Shingle Installation

9th Grade

20 Qs

quiz-placeholder

Similar activities

Onshape Basics

Onshape Basics

6th - 12th Grade

17 Qs

Drawing Symbols

Drawing Symbols

9th - 12th Grade

15 Qs

Architect Dictums, Quotes, Philosophies - 01

Architect Dictums, Quotes, Philosophies - 01

7th Grade - Professional Development

15 Qs

Places of Eminence- Sources of History

Places of Eminence- Sources of History

8th Grade - University

17 Qs

Roof and Floor framing

Roof and Floor framing

9th Grade

20 Qs

Bldg Law PH - PD 957 - 01

Bldg Law PH - PD 957 - 01

7th Grade - Professional Development

20 Qs

Building Laws Quiz 2- PD 1096

Building Laws Quiz 2- PD 1096

KG - Professional Development

15 Qs

MADRASSA QUIZ MIIS

MADRASSA QUIZ MIIS

4th Grade - University

20 Qs

Shingle Installation

Shingle Installation

Assessment

Quiz

Architecture

9th Grade

Practice Problem

Hard

Created by

Jacob Navarrete

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What tool is used to cut the drip edge?

Utility knife

Tin snips

Hacksaw

Circular saw

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How far up the rake should the drip edge extend?

1 inch

2 inches

3 inches

4 inches

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where is the drip edge nailed to the roof deck?

Every 12 inches

Every 18 inches

Every 24 inches

Every 36 inches

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main safety concern when working with building paper?

It tears easily

It is slippery

It melts in the sun

It is too heavy

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How far apart should nails be placed along the edges of the building paper?

6 inches

12 inches

18 inches

24 inches

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where is the rake drip edge installed relative to the building paper?

Under it

On top of it

Parallel to it

Perpendicular to it

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How should the building paper be cut before installing the rake drip edge?

1 inch beyond the fascia

Flush with the fascia board

Overlapping the fascia board

At a 45-degree angle

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?