Search Header Logo

Carpentry Technology: Exterior Finishes Study Guide 2

Authored by Christopher Kauffman

Other

12th Grade

Carpentry Technology: Exterior Finishes Study Guide 2
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Inside and outside corners are installed 1/4" below the bottom edge of the ______ strip and tight to the soffit.

corner

edge

base

top

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Chalk a vertical ______ line to the inside dimension of your outside corner on both sides of an outside corner.

line

circle

square

triangle

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Nail the upper most slot at the ______ of first nailing slot. Continue nailing in the center of the slot every 12" - 16" on both sides ensuring the outside corner is straight & true.

top

bottom

side

middle

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Measure the ______ of your starter strip. Chalk a ______ along the entire length of all sides of the house or structure, using a ______ so that your starter strip covers over the joint between the ______ and your foundation by 1/2".

length, line, level, joint

width, curve, ruler, wall

height, mark, tape, roof

depth, path, scale, floor

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

On the ______ piece of siding under a sill or at the top of a wall use ______ to provide a tab for the under sill to catch.

The question has a diagram associated with it. The diagram has been stored separately.

nail

screw

adhesive

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?