Carpentry Technology: Exterior Finishes Study Guide 2
Authored by Christopher Kauffman
Other
12th Grade

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
5 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Inside and outside corners are installed 1/4" below the bottom edge of the ______ strip and tight to the soffit.
corner
edge
base
top
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Chalk a vertical ______ line to the inside dimension of your outside corner on both sides of an outside corner.
line
circle
square
triangle
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Nail the upper most slot at the ______ of first nailing slot. Continue nailing in the center of the slot every 12" - 16" on both sides ensuring the outside corner is straight & true.
top
bottom
side
middle
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Measure the ______ of your starter strip. Chalk a ______ along the entire length of all sides of the house or structure, using a ______ so that your starter strip covers over the joint between the ______ and your foundation by 1/2".
length, line, level, joint
width, curve, ruler, wall
height, mark, tape, roof
depth, path, scale, floor
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
On the ______ piece of siding under a sill or at the top of a wall use ______ to provide a tab for the under sill to catch.
The question has a diagram associated with it. The diagram has been stored separately.
nail
screw
adhesive
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?