Carpentry EOPA Part 3

Carpentry EOPA Part 3

9th - 12th Grade

19 Qs

quiz-placeholder

Similar activities

Math in construction 1

Math in construction 1

11th Grade

16 Qs

processppt2plenary

processppt2plenary

11th Grade

16 Qs

Plumbing L1 Baseline assessment

Plumbing L1 Baseline assessment

12th Grade

20 Qs

Timber Repairs final quiz

Timber Repairs final quiz

12th Grade - University

17 Qs

Maintenance 210

Maintenance 210

12th Grade - University

16 Qs

109 Introduction to Materials Handling #2 Quiz

109 Introduction to Materials Handling #2 Quiz

9th Grade

20 Qs

Étude de Prix - Séance 3

Étude de Prix - Séance 3

12th Grade

23 Qs

Understanding UAE Construction Contracts

Understanding UAE Construction Contracts

12th Grade

20 Qs

Carpentry EOPA Part 3

Carpentry EOPA Part 3

Assessment

Quiz

Construction

9th - 12th Grade

Medium

Created by

Jacci Robinson

Used 3+ times

FREE Resource

19 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

When constructing a built-in, where can one find specified sizes, shapes and finishes?

Builders can use personal judgment for these elements, so they are not specified anywhere 

Written on the drywall for where the built-in will be placed 

Project blueprints or plans 

Owners decide these elements, SO the builder should leave them unfinished 

2.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

Why is it important to adhere to industry standards during the installation of wood shingles and miter corners? 

To increase project costs. 

To ignore safety precautions. 

To ensure Structural integrity. 

To speed up the process. 

3.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

What should always be included with an engineered lumber delivery? 

Correct nails, hangers and engineered lumber saw blades 

Engineering data and application drawing for the materials 

Composite shims, post bases and hangers 

Positive Placement Fasteners, Hangers and LVL Flat Lock Screws 

4.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

In a finish schedule, what does the abbreviation “SQFT” stand for?

Surface Quality for Finishing Techniques 

Square Footage 

Structural Quality for Flooring Treatments 

Standard Quantity for Finishing Tasks 

5.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

How accurate would a 300’ water level be over a 225’ span? 

Plus/minus 1/16” 

Plus/minus 1/8” 

Plus/minus 0”. 

Plus/minus ¼” 

6.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

Blueprints for closets should always specify which of the following? 

Location and finish 

Location only 

Size location and finish 

Size only

7.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

In construction terminology, what does the acronym “ROW” stand for? 

Right-of-Way 

Reclaimed Wood 

Residential Overlay Zone 

Record of Work 

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?