OPM_Quiz1

OPM_Quiz1

University

20 Qs

quiz-placeholder

Similar activities

LEVELLING FOR CIVIL ENGINEERING

LEVELLING FOR CIVIL ENGINEERING

University

20 Qs

Online Webinar by Krunal Talsaniya

Online Webinar by Krunal Talsaniya

University

20 Qs

Untitled Quiz

Untitled Quiz

1st Grade - University

20 Qs

GREEN TECHNOLOGY COMPLIANCE

GREEN TECHNOLOGY COMPLIANCE

University

20 Qs

Flue Gas Analysis

Flue Gas Analysis

University

20 Qs

Network Analysis Quiz

Network Analysis Quiz

University

15 Qs

English for Engineering: Safety Sign

English for Engineering: Safety Sign

University

20 Qs

PROFESSIONAL ETHICS

PROFESSIONAL ETHICS

University

20 Qs

OPM_Quiz1

OPM_Quiz1

Assessment

Quiz

Engineering

University

Practice Problem

Hard

Created by

Khairul MatSaad

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the primary role of the Project Management Office (PMO) in offshore engineering projects?

Performing daily maintenance activities

Establishing and implementing project management standards

Overseeing construction quality

Designing offshore structures

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the purpose of pre-commissioning checks in offshore projects?

Designing subsea systems

Verifying system integrity before startup

Installing safety equipment

Mapping geological formations

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

In project scheduling, what does the Work Breakdown Structure (WBS) help achieve?

Defining the scope of work in hierarchical levels

Estimating the duration of tasks

Optimizing resource utilization

Identifying critical risks

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which of the following technologies has significantly improved pipeline inspection in offshore engineering?

Underwater welding

Advanced drilling rigs

Unmanned submersibles and drones

Jack-up platforms

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the key responsibility of the engineering manager in an offshore project?

Procurement of materials

Leading risk assessment efforts

Ensuring all technical requirements are met

Managing stakeholder communication

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the primary challenge associated with offshore storage facilities?

Accessibility and environmental protection

Limited access to fresh water

High operational costs for onshore materials

Inadequate safety regulations

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Why is stakeholder engagement crucial in offshore projects?

To expedite project timelines

To reduce project budgets

To ensure alignment and minimize conflicts

To streamline procurement processes

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?