307 Central Heating Systems 3 Quiz

307 Central Heating Systems 3 Quiz

2nd Grade

10 Qs

quiz-placeholder

Similar activities

Quiz on BedZED: Pioneering Sustainable Community Living

Quiz on BedZED: Pioneering Sustainable Community Living

University

9 Qs

Building Operations and renovations

Building Operations and renovations

9th Grade

10 Qs

Fall Furnace Maintenance Quiz

Fall Furnace Maintenance Quiz

10th Grade

10 Qs

Plumbing Systems Decommissioning Quiz

Plumbing Systems Decommissioning Quiz

12th Grade - University

13 Qs

PPT 3 - Pipework & Circulation COL

PPT 3 - Pipework & Circulation COL

12th Grade - University

15 Qs

Hot Water PowerPoint 1 Questions

Hot Water PowerPoint 1 Questions

10th Grade

15 Qs

Greywater & McHP

Greywater & McHP

2nd Grade - University

15 Qs

Water Properties Quiz

Water Properties Quiz

11th Grade - University

15 Qs

307 Central Heating Systems 3 Quiz

307 Central Heating Systems 3 Quiz

Assessment

Quiz

Construction

2nd Grade

Medium

Created by

Darren Harvey

Used 20+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What heating system uses a difference in the density of water to circulate heat to a hot water cylinder?

Y plan

Gravity fed

S plan+

Hypocaust

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The conservation of fuel and energy is covered by which approved document?

Building regulations part P

Building regulations part M

Building regulations part H

Building regulations part L

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main purpose of a central heating system?

To heat up the core of the building

To provide thermal comfort to a property

To supply heating to a single room

To provide heat to a number of properties

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is at the highest point of a vented heating system?

Expansion vessel

Feed and expansion cistern

Cold feed isolation valve

Automatic air vent

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary function of the open vent on a central heating system?

To allow the system to pressurise

To allow the system to operate at atmospheric pressure

To provide sufficient oxygen to the heating system

To provide a means of ventilation when filling the system

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of heating system incorporates a three-port valve that gives priority to the hot water system?

S plan

S plan+

Y plan

W plan

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What three components are required when converting an open vented system with a sealed system?

Automatic air vent, low loss header, filling loop

Filling loop, expansion vessel, pressure gauge

Pressure relief valve, filling loop, expansion vessel

Expansion vessel, automatic air vent, pressure gauge

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?