Building Up Rates Quiz: Reinforcement

Building Up Rates Quiz: Reinforcement

University

7 Qs

quiz-placeholder

Similar activities

MEC241 20244

MEC241 20244

University

10 Qs

RECAP UNIT 1 & 2

RECAP UNIT 1 & 2

University

10 Qs

Asesmen Diagnostik

Asesmen Diagnostik

10th Grade - University

10 Qs

CNN Layer

CNN Layer

University

10 Qs

EXAMEN ET II 1P

EXAMEN ET II 1P

University

10 Qs

Quiz sobre la Naturaleza de los Conductores

Quiz sobre la Naturaleza de los Conductores

University

10 Qs

RC Beam - Quiz (2)

RC Beam - Quiz (2)

University

10 Qs

1ER.PARCIAL ING. INDUSTRIAL- TERMOFLUIDOS

1ER.PARCIAL ING. INDUSTRIAL- TERMOFLUIDOS

University

7 Qs

Building Up Rates Quiz: Reinforcement

Building Up Rates Quiz: Reinforcement

Assessment

Quiz

Engineering

University

Easy

Created by

a'fifah khairunnisa zulkiflee

Used 1+ times

FREE Resource

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the wastage percentage for cutting and damage in reinforcement work?

2%

5%

10%

15%

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the weight of a 10 mm diameter reinforcement bar per meter?

1.579 kg/m

0.888 kg/m

0.616 kg/m

0.395 kg/m

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many hours does it take for a blacksmith to cut and bend 1 tonne of 16 mm Ø reinforcement?

30 hours

25 hours

20 hours

15 hours

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the labor output for unloading and sorting output per tonne?

2 hours

1.50 hours

2.50 hours

1 hour

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the weight of a 25 mm diameter reinforcement bar per meter?

2.466 kg/m

3.854 kg/m

6.313 kg/m

9.864 kg/m

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the labor output for placing bars in a wall for 1 tonne of 16 mm Ø reinforcement?

30 hours

35 hours

50 hours

40 hours

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the wastage percentage for ready to use bars (cut and bend)?

5%

2%

15%

10%