214 ppt 9 Soundness Testing and commissioning

214 ppt 9 Soundness Testing and commissioning

11th Grade

15 Qs

quiz-placeholder

Similar activities

Mastering Metal Welding Techniques

Mastering Metal Welding Techniques

11th Grade

12 Qs

Refrigeration cycle Vocab test

Refrigeration cycle Vocab test

9th - 12th Grade

11 Qs

Electrical Technology NCCER (11th Edition) Module 1 Review

Electrical Technology NCCER (11th Edition) Module 1 Review

9th - 12th Grade

10 Qs

Multi-skills induction

Multi-skills induction

11th Grade

10 Qs

303 Scientific Principles Quiz

303 Scientific Principles Quiz

2nd Grade - University

20 Qs

Concrete Quiz Review

Concrete Quiz Review

9th - 12th Grade

17 Qs

Cordless Drill Identification of Components #2

Cordless Drill Identification of Components #2

11th Grade - University

15 Qs

HVACR LVL 1 Mod 4 Review

HVACR LVL 1 Mod 4 Review

9th - 12th Grade

20 Qs

214 ppt 9 Soundness Testing and commissioning

214 ppt 9 Soundness Testing and commissioning

Assessment

Quiz

Construction

11th Grade

Easy

Created by

Trevor Armstrong

Used 2+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which type of joints should be checked to ensure they are tight before soundness testing?

Soldered joints

Compression joints

Welded joints

Glued joints

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be checked to ensure that soldered joints are properly made?

They are painted

They are insulated

They are visible

They are secure

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be attached after the system stands for 30 minutes?

Pressure gauge

Hydraulic test bucket

Water pump

Leak detector

4.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

What standard should the soundness testing conform to? (bonus point for correct answer)

BSEN800

BSEN806

BSEN810

BSEN820

5.

FILL IN THE BLANK QUESTION

30 sec • 1 pt

If the example pressure given for a system is working at 3 bar, the pressure we should test to is _____

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which material would be pressurised for an hour at 1.5x working pressure, to be assessed for soundness ?

Plastic pipes

Copper and steel pipes

Aluminum pipes

PVC pipes

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the soundness testing of a plastic pipe (polybutylene)?

Pump the system to 1 bar.

Walk around the system and check for leaks.

Slowly fill the system with water.

Increase pressure to 1.5 x working pressure.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?