Phase4mod6tight

Phase4mod6tight

Professional Development

7 Qs

quiz-placeholder

Similar activities

Principles of Food Hygeine_1

Principles of Food Hygeine_1

Professional Development

10 Qs

motion and measurement of distances

motion and measurement of distances

KG - Professional Development

10 Qs

The Red Lotus x Zephyr Webinar

The Red Lotus x Zephyr Webinar

KG - Professional Development

8 Qs

Kisi-kisi UAS 5, 6 dan 7

Kisi-kisi UAS 5, 6 dan 7

Professional Development

11 Qs

The impact of COVID-19 on dental health and education

The impact of COVID-19 on dental health and education

University - Professional Development

10 Qs

Quiz sesión 1 - Formación en EE Colombia Productiva

Quiz sesión 1 - Formación en EE Colombia Productiva

Professional Development

10 Qs

Física Materia - Quiz 02 - Entropía, caos y orden

Física Materia - Quiz 02 - Entropía, caos y orden

8th Grade - Professional Development

12 Qs

Pre Test HACCP

Pre Test HACCP

Professional Development

10 Qs

Phase4mod6tight

Phase4mod6tight

Assessment

Quiz

Science

Professional Development

Practice Problem

Hard

Created by

Craig Boothright

Used 11+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The permissible leakage rate for a new gas installation is:

0mb.

1mb.

2mb.

4mb.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the time period that must be allowed for a domestic tightness test?

1 min.

2 mins.

3 mins.

4mins.

3.

FILL IN THE BLANK QUESTION

1 min • 1 pt

If during the initial stages of a tightness test the meter control should be found to be passing gas, what must the gas operative do?

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What equipment must be used to pin point the source of a gas escape?

A U Tube manometer.

An electronic gas detector.

Diluted washing up liquid.

Leak detector solution.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When testing a new installation with air prior to the installation of a gas supply ,it is not necessary to allow 1 minute for stabilisation:

True.

False

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Prior to the domestic tightness test, 1 minute is allowed to check for the meter control passing gas. If this test was not carried out, the consequences could be:

Gas may be escaping through the inlet supply.

The gas pressure could rise within the meter.

Gas that is escaping could be replaced from the supply.

Gas escaping from the service would be recorded.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If when carrying out a tightness test, the readings on each side of a U gauge are 16mb and 20mb, The pressure at which the test is carried out is:

16mb.

20mb.

18mb.

36mb.