Understanding Design Constraints

Understanding Design Constraints

10th Grade

15 Qs

quiz-placeholder

Similar activities

Ancient to Renaissance Construction Quiz

Ancient to Renaissance Construction Quiz

9th Grade - University

10 Qs

Zagrożenia zdrowotne w pracy ABC

Zagrożenia zdrowotne w pracy ABC

9th Grade - University

10 Qs

Introduction to Metal Working Tools

Introduction to Metal Working Tools

10th Grade

15 Qs

Qualities and Roles of a Frontline Leader

Qualities and Roles of a Frontline Leader

10th Grade

15 Qs

306 hot water systems 1 Quiz

306 hot water systems 1 Quiz

2nd Grade - University

20 Qs

The Goal Graphic Novel Quiz (Chpt 3-4)

The Goal Graphic Novel Quiz (Chpt 3-4)

9th - 12th Grade

10 Qs

Construction Quarterly Review

Construction Quarterly Review

9th Grade - University

20 Qs

Quarterly Review Test – Production Technology

Quarterly Review Test – Production Technology

9th Grade - University

20 Qs

Understanding Design Constraints

Understanding Design Constraints

Assessment

Quiz

Construction

10th Grade

Hard

Created by

Nathan Cardwell

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT listed as an influence or constraint on design in the document?

Resources

Local environment

Local planning and building control requirements

Weather conditions

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to the document, what must learners understand about design?

Influences and constraints

Artistic styles

Historical contexts

Technological innovations

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of understanding the needs of a client in the context of the document?

To design a low-rise building

To design a high-rise building

To design a bridge

To design a park

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of understanding local planning and building control requirements?

To ensure compliance with regulations

To enhance aesthetic appeal

To improve energy efficiency

To increase construction speed

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the cost per square meter according to the example?

£6000/m²

£8000/m²

£7000/m²

£9000/m²

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary focus of the example given?

Design aesthetics

Cost efficiency

Floor area analysis

Material quality

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a retail unit costs £2,000,000 and the cost per square meter is £4000, what is the floor area?

500 m²

600 m²

700 m²

800 m²

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?