
Initial F50 phase 2
Authored by Jorgee Bonillam
Specialty
University
Used 3+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
22 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
How can you check the integrity of the AHRS wiring interfaces_
Make a test from the Test button on the AHRS computers
Make a test from the Avioncs panel
Mahe a AHRS test from the MTP
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The longest and narrow country in the world is
Chile
Rusia
Uganda
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which system uses the value of 250 feet?
AHRS
altitude alert
longitudinal stability augmentation system
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why should you wait 9 minutes before removing the stand by horizon?
To wait for the spinning to stop completely
to prevent short circuit
To avoid burning your hands
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The buttons on the PLAs are used to
To disconnect the Flight directors
To activate the GA and the limit of pitch
De activate the to
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Accessory bays have several components such as...
Electrical pump
Pressure accumulators
Press filter modules
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The hydraulic electric pump can be used in flight without restriction
Yes of course it is a back up pump
no because the pump has a limited operating time
yes during hi demand
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?