Requirements Engineering Quiz

Requirements Engineering Quiz

University

8 Qs

quiz-placeholder

Similar activities

2018Quiz1INT202

2018Quiz1INT202

University

13 Qs

Waterfall Methodology

Waterfall Methodology

University

10 Qs

CSC 306 Module 1 Assessment

CSC 306 Module 1 Assessment

University

11 Qs

4. Day 2_ITBA 10 Soal

4. Day 2_ITBA 10 Soal

KG - Professional Development

10 Qs

ECM3434 Business Analysis 1 - Introduction and BA techniques

ECM3434 Business Analysis 1 - Introduction and BA techniques

University

10 Qs

FD_SE_06_Requirements_Validation

FD_SE_06_Requirements_Validation

KG - Professional Development

10 Qs

Agile W1 - Chk1

Agile W1 - Chk1

University

12 Qs

Requirement engineering

Requirement engineering

University - Professional Development

10 Qs

Requirements Engineering Quiz

Requirements Engineering Quiz

Assessment

Quiz

Computers

University

Hard

Created by

velantina DRTTIT

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the Requirements Engineering process?

Requirements specification

Requirements elicitation

Feasibility Study

Requirements management

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which type of feasibility study focuses on the financial aspects of a project?

Economic Feasibility

Operational Feasibility

Technical Feasibility

Legal Feasibility

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of requirements verification?

To check that requirements are correctly specified

To ensure the software meets user needs

To gather information from stakeholders

To document the requirements

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which technique is NOT used for requirements elicitation?

Interviews

Surveys

Code Review

Prototyping

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main goal of requirements management?

To validate the requirements

To document requirements clearly

To track and control changes to requirements

To gather requirements from stakeholders

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a non-functional requirement?

Input validation

Performance

Data storage

User authentication

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the requirements specification process produce?

Formal software requirement models

Stakeholder feedback

Project timelines

Cost-benefit analysis

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a disadvantage of the Requirements Engineering process?

It ensures stakeholder needs are met

It can be time-consuming and costly

It improves communication

It helps identify potential issues early