S26 Service

S26 Service

University

15 Qs

quiz-placeholder

Similar activities

BP 344 Quiz

BP 344 Quiz

University - Professional Development

15 Qs

Noise Control & Acoustic Design

Noise Control & Acoustic Design

University

17 Qs

TROPICAL DESIGN PRELIM EXAM ARCH2A

TROPICAL DESIGN PRELIM EXAM ARCH2A

University

20 Qs

Research Methodology Part 2

Research Methodology Part 2

University

10 Qs

RC Stairs

RC Stairs

University

10 Qs

Plate Motion Mid-Unit Assessment

Plate Motion Mid-Unit Assessment

7th Grade - University

16 Qs

Quiz II - History and Theory of Architecture

Quiz II - History and Theory of Architecture

University

11 Qs

Lighting Design Set 2

Lighting Design Set 2

University

10 Qs

S26 Service

S26 Service

Assessment

Quiz

Architecture

University

Practice Problem

Easy

Created by

Chris Ho

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of identifying and implementing allowances for services to be installed?

To ensure proper budgeting and planning

To increase construction costs

To delay project timelines

To reduce the quality of materials

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the impact of time-dependent effects in construction?

Creep

Expansion

Color change

Material hardening

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is necessary to tap into relevant services?

Permission from the relevant authority

A map of the area

A list of service providers

A financial report

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a consideration regarding the placement of services?

Whether they are underground or overhead

The color of the service

The brand of the service

The age of the service

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of contacting 'Dial before you Dig'?

To get a building permit

To locate and get all services full set of location drawings

To schedule a construction inspection

To order construction materials

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be checked on the land title before installing building services?

The presence of a septic tank

Whether an easement has been constructed

The depth of the connection point

The type of soil

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who should be consulted for the connection point of building services?

The construction manager

The local authority

The building owner

The architect

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?