B15 Adv GATE_Section 1_18.12

B15 Adv GATE_Section 1_18.12

Professional Development

12 Qs

quiz-placeholder

Similar activities

LARO 21: Synergy - Rule 7&8

LARO 21: Synergy - Rule 7&8

Professional Development

10 Qs

Sososososso

Sososososso

University - Professional Development

10 Qs

7W GATE D5

7W GATE D5

Professional Development

13 Qs

7W GATE D8

7W GATE D8

Professional Development

17 Qs

7W GATE D3

7W GATE D3

Professional Development

10 Qs

Razonamiento Espacial

Razonamiento Espacial

Professional Development

10 Qs

Global Townhall

Global Townhall

Professional Development

9 Qs

Landscaping Focal Points Quiz

Landscaping Focal Points Quiz

Professional Development

11 Qs

B15 Adv GATE_Section 1_18.12

B15 Adv GATE_Section 1_18.12

Assessment

Quiz

Architecture

Professional Development

Medium

Created by

BD Kaarwan

Used 3+ times

FREE Resource

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following is a Vector Graphics Software?

Inkscape

Odeon

Adobe Dreamweaver

Design Builder

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The main cable of a suspension bridge supports the deck with hangars. These hangars are equidistant along the length of the bridge and represent a uniformly distributed load. Assuming the cable to be weightless as compared to the applied loading, the best approximation of the shape that the cable takes for this loading is a ___________.

Catenary curve

Circular arc

Parabolic curve

Hyperbolic curve

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Media Image

The following two-dimensional visual composition represents ___________.

Interlocking

Intersecting

Interlacing

Interpenetrating

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The Golden Ratio refers to ___________.

1:√2

2: 1+√5

1:1

16:9

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The correct sequence of the following Construction Project Development stages, as per the National Building Code of India 2016 is ___________.

(P) Resource Planning 

(Q) Project Inception 

(R) Commissioning and Handing over 

(S) Tendering 

(T) Site Survey and Soil Investigation 

(U) Selection of Construction Methodology

P-Q-R-T-U-S

T-Q-R-U-S-P

Q-T-U-P-S-R

Q-T-P-S-U-R

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Match the aspects in Group I with the corresponding items in Group II.

 Group I Group II 

(P) Fire safety (1) Intruder alarm 

(Q) Seismic safety (2) Zero–strength barrier 

(R) Water efficiency (3) Stair lift 

(S) Accessible design (4) Aerator 

(5) Auxiliary damper

P-4, Q-5, R-2, S-3

P-5, Q-1, R-4, S-2

P-2, Q-4, R-5, S-1

P-2, Q-5, R-4, S-3

7.

MULTIPLE SELECT QUESTION

2 mins • 1 pt

Which of the following is/are classified as the Principles of Universal Design?

Perceptible Information

Tolerance for Error

Occult Balance

Simple and Intuitive Use

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?