++PP3-EO2 M1

++PP3-EO2 M1

2nd Grade

30 Qs

quiz-placeholder

Similar activities

The Stuff that Dreams Are Remade Of (WSC 2024_Dani, Ian, Indira)

The Stuff that Dreams Are Remade Of (WSC 2024_Dani, Ian, Indira)

1st - 5th Grade

25 Qs

occupation 2

occupation 2

KG - 9th Grade

25 Qs

HCT Level 2 CA List 2

HCT Level 2 CA List 2

KG - University

30 Qs

unit 4

unit 4

1st - 5th Grade

30 Qs

Q1 - HRM

Q1 - HRM

2nd Grade

30 Qs

lesson 33(23/6)

lesson 33(23/6)

2nd Grade

25 Qs

Jobs

Jobs

1st - 3rd Grade

30 Qs

Wakatta Unit 1 Occupations

Wakatta Unit 1 Occupations

KG - 12th Grade

31 Qs

++PP3-EO2 M1

++PP3-EO2 M1

Assessment

Quiz

World Languages

2nd Grade

Medium

Created by

Renato Santos

Used 1+ times

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

a process that involves establishing goals and objectives for a project, and then determining the

actions and resources needed to achieve those goals.

Urban Design

Environmental Design

Planning

Built Environment

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

a licensed architect or architecture firm that is responsible for the design

and construction documents for a building project.

Project Architect

Design Architect

Architect-of-Record

Project Manager

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

It encompasses the scope, responsibilities, and professional fees for services beyond

standard design work, including the detailed planning and design of specific components like interiors, landscaping, or acoustics. It also covers collaboration with other specialists

and sets the terms for professional fees based on the complexity and scope of the services provided.

Comprehensive Services

Post-Construction Services

Allied Services

Supplemental

Services

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

involves the detailed planning and design of the indoor/enclosed areas of any proposed building/structure,

including retrofit, renovation, and rehabilitation, or expansion work that shall cover all architectural and utility aspects, including the architectural lay-outing of all building engineering systems.

Interior Construction

Architectural Interiors

Interior Architecture

Interior Design

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Depending on the complexity of the Project, the Construction Manager

undertaking professional AI services must be sufficiently experienced

in the planning, design, and detailing of AI elements.

TRUE

FALSE

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

The Construction Manager assist the Client in conducting bids or negotiations with General Contractors, sub-contractors, and suppliers of building materials, furniture, equipment, fixtures, etc.

TRUE

FALSE

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

are works detailing the act of planning, designing, specifying,

supervising, and giving general administration and responsible direction to

the functional, orderly, and aesthetic arrangement, changing and development of

natural scenery and land areas.

Urban Planning Services

Landscaping Services

Planning Services

Environmental Services

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?