API 570 Sec. 8

API 570 Sec. 8

Professional Development

5 Qs

quiz-placeholder

Similar activities

ASME B31.8 M2 Ch I and II

ASME B31.8 M2 Ch I and II

Professional Development

6 Qs

Agent Queues

Agent Queues

Professional Development

10 Qs

HACCP

HACCP

Professional Development

10 Qs

API 576 quiz 1

API 576 quiz 1

Professional Development

10 Qs

AWS ACF Módulo 10 - Auto Scaling e monitoramento

AWS ACF Módulo 10 - Auto Scaling e monitoramento

Professional Development

10 Qs

1_หน้าที่รับผิดชอบของแผนก (Job Description, Organization)

1_หน้าที่รับผิดชอบของแผนก (Job Description, Organization)

Professional Development

10 Qs

TEP piping 3

TEP piping 3

Professional Development

10 Qs

A)Prestressed Concrete HW(IBC-318)

A)Prestressed Concrete HW(IBC-318)

Professional Development

10 Qs

API 570 Sec. 8

API 570 Sec. 8

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

nns s nsbs

FREE Resource

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Who may give prior general authorization for routine repairs?

examiner

inspector

operating personnel

piping engineer

2.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Authorization for alteration work shall be given by:

inspector and piping engineer

inspector only

owner-operator

supervisor for repair company

3.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Who should be consulted when attempting welding repair on cracks?

inspection supervisor

corrosion specialist

piping engineer

welding engineer

4.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

The minimum distance between the toe of the fillet weld for R of pipe = 10", t of patch = 0.5"?

10.22"

8.94"

7.25"

5.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Hot tapping as per API 570 code shall be done in accordance with:

API 2201

API 574

ASME PCC-2

ASME PCC-1