20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Quality is achieved when ___

We exceed customer's every expectation.

We exceed customer's expectation is some way or other.

The defined requirements of the customers are fulfilled.

The number of benefits far outweighs the number of defects.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following statements is TRUE regarding Precision and Accuracy?

Precision and accuracy are the same.

Precise measurements are not necessarily accurate, but accurate measurements are definitely precise.

Precision cannot be measured accurately, and accuracy is never precise.

Accuracy is correctness that the measured value is very close to the true value. Precision is consistency that the value of repeated measurements are clustered and have little scatter.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Modern quality management practices promote that:

Inspection helps to identify problems; therefore it is a method of choice for quality management processes.

Prevention helps to avoid problems, and reduces the overall costs of correcting them in the long run.

Inspection and Prevention are both Tools and Techniques of the Quality Planning Process.

Cost of Conformance will always be lower than the cost of nonconformance.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the end, Quality is the responsibility of

The Customer

The Project Manager

The Team Members

The Senior Management

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Plan-Do-Check-Act cycle was created by:

Dr Edwards Deming

Dr Joseph Juran

Philip Crosby

Steven Covey

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Perform Quality Assurance process is:

Where the customer formally accepts the product.

Where the customer performs a test of the product of the project to check for correctness of the work product.

Where any variances are recorded as changes and sent to Change Control Board for review.

Where it is determined if the standards are being met, work is continuously improved and problem areas are identified and fixed.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An Ishikawa diagram is the same as a

Run Chart

Fish Bone Diagram

Pareto Chart

Delphi Technique Diagram

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?