Phase4mod4 vent

Phase4mod4 vent

Professional Development

15 Qs

quiz-placeholder

Similar activities

Domestic Fuel Systems QuizL3P3,U11,LO2,IAN

Domestic Fuel Systems QuizL3P3,U11,LO2,IAN

Professional Development

20 Qs

ACS Quiz 2

ACS Quiz 2

Professional Development

11 Qs

Unsafe Situations (Examples) GIUSP

Unsafe Situations (Examples) GIUSP

Professional Development

12 Qs

Phase 4 mod3

Phase 4 mod3

Professional Development

12 Qs

Domestic Gas Ventilation Quiz

Domestic Gas Ventilation Quiz

Professional Development

10 Qs

Phase 3 Revision

Phase 3 Revision

Professional Development

15 Qs

Management of NIV

Management of NIV

Professional Development

10 Qs

phase4,mod12.chimney

phase4,mod12.chimney

Professional Development

14 Qs

Phase4mod4 vent

Phase4mod4 vent

Assessment

Quiz

Science

Professional Development

Hard

Created by

Craig Boothright

Used 4+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The purpose of the top vent installed within a compartment is to:

Assist the pull of the flue.

Supply air for combustion.

Remove warm air cooling.

Reduce the pull of the flue.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The ventilation requirement for open flued appliances is dependent upon:

Heat input.

Heat output

Room dimensions

Flue height

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If both appliances mentioned in 7 and 8 were fitted in the kitchen , what is the vent free area ,in addition to the openable window, required?

100cm2

145cm2

245cm2

290cm2

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A gas fire and a back boiler of inputs 7kw(gross) and 16kw(gross respectively has recently been fitted in a bedsitting room. What is the ventilation requirement?

37cm2

68.6cm2

120cm2

Installation not allowed.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What action should the gas operative take if an air vent ,of adequate size but fitted with a fly screen , is encountered?

Install another air vent of the same size with a fly screen.

With the users permission remove the fly screen.

Leave the vent and instruct the user to clean regularly.

Disconnect the appliance and label.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A room sealed boiler with a range rated burner from 16kw to 21kw (net) is fitted in a compartment and set at 18.5kw (net).What are the required vents to direct outside?

51.75cm2 both top and bottom.

70cm2 both top and bottom.

92.5cm2 both top and bottom.

105cm2 both top and bottom.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An open flued combination boiler with hot water input of 36kw(net) and heating input of 21kw(net) is fitted within a kitchen measuring 2.5m by 2.2m by 1.8m. What is the vent free area required?

70cm2

130.5cm2

145cm2

180cm2

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?