Lesoon 16-17

Lesoon 16-17

12th Grade

10 Qs

quiz-placeholder

Similar activities

Lesson 15

Lesson 15

12th Grade

10 Qs

City sewer

City sewer

8th Grade - University

10 Qs

Breathing and Gas Exchange

Breathing and Gas Exchange

9th - 12th Grade

12 Qs

Diamond Quiz

Diamond Quiz

12th Grade

15 Qs

Fluid Dynamics

Fluid Dynamics

8th Grade - University

15 Qs

Wrenches

Wrenches

12th Grade - University

15 Qs

ROV Parts

ROV Parts

9th - 12th Grade

10 Qs

Lesoon 16-17

Lesoon 16-17

Assessment

Quiz

Science

12th Grade

Easy

NGSS
MS-PS3-3, MS-ETS1-1

Standards-aligned

Created by

Катерина Гунтік

Used 1+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fill in the blanks with the correct words: ___________ is the process of installing and removing sinks, toilets, and other fixtures in the bathroom, kitchen, and toilet.

installation

dismantling

pipeline works

elimination of blockages

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fill in the blanks with the correct words: The ___________ system is responsible for carrying wastewater away from the home.

sewer

heating equipment

old pipes

supply systems

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of eliminating leaks in heating systems?

save water

prevent water damage and improve system efficiency

increase water pressure

reduce heating costs

Tags

NGSS.MS-PS3-3

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which task is specifically focused on maintaining the cleanliness and function of a building's plumbing?

plumbing restoration

sewer network maintenance

istallation and dismantling of sanitary ware

maintenance of residential and industrial buildings

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To ensure a precise fit, first, _________ the length of the pipe.

cut off

check

measure

call a plumber

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If the pipe is too long, you need to _________ it to the correct size.

remove

cut off

press

grind

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Once the alignment is confirmed, _________ the pipes and fittings with a marker for accurate positioning.

mark

degrease the end

check

connect

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?