Revision Demolition and Recycling Quiz

Revision Demolition and Recycling Quiz

10th Grade

8 Qs

quiz-placeholder

Similar activities

Measuring Skills for Apprentices

Measuring Skills for Apprentices

10th Grade

10 Qs

Hazardous materials + SDS + WHMIS

Hazardous materials + SDS + WHMIS

9th - 12th Grade

10 Qs

Primary and Secondary Processes Quiz

Primary and Secondary Processes Quiz

9th Grade - University

10 Qs

Sustainable Construction Quiz Level 1

Sustainable Construction Quiz Level 1

10th Grade

10 Qs

Basic Communication Skills Quiz

Basic Communication Skills Quiz

10th Grade

10 Qs

Hazards, Health & Safety PPE Safety Quiz 2024

Hazards, Health & Safety PPE Safety Quiz 2024

9th - 12th Grade

13 Qs

 Revision cellular and rectangular construction

Revision cellular and rectangular construction

10th Grade

9 Qs

NCCER Quiz

NCCER Quiz

10th Grade

12 Qs

Revision Demolition and Recycling Quiz

Revision Demolition and Recycling Quiz

Assessment

Quiz

Construction

10th Grade

Hard

Created by

E Donovan-Bayley

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which stage shows the building after the demolition process is complete?

Pre-Demolition

The Demolition

Post-Demolition

None of the above

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the effect of contaminants on recyclable construction waste?

It makes the waste more valuable

It makes the waste easier to process

It makes the waste harder to collect, sort, and process

It has no effect on the waste

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a reason why construction and demolition sites are challenging for recycling?

They produce too much waste

They are located in remote areas

They contain debris with contaminants

They have strict regulations

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the impact of moving heavy materials off-site on time?

It reduces time

It adds time

It has no impact on time

It saves time

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one of the benefits of using recycled building materials?

Increases the need for new raw materials

Reduces strain on landfills

Increases air and water pollution

Consumes more energy than existing materials

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a common method for reducing waste at construction sites?

Burning waste materials

Reusing materials on-site

Dumping waste in landfills

Ignoring waste management

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following materials is often recycled in construction?

Plastic bottles

Concrete

Food waste

Textiles

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a benefit of deconstructing buildings instead of demolishing them?

It is faster

It generates more waste

It allows for material reuse

It is more expensive