006 Hot Water Quiz

006 Hot Water Quiz

Professional Development

20 Qs

quiz-placeholder

Similar activities

AUT-101 CH13 Wk2

AUT-101 CH13 Wk2

Professional Development

20 Qs

Machinist Grinder 3rd Sem - NSQF - Module 2 : Surface grinding

Machinist Grinder 3rd Sem - NSQF - Module 2 : Surface grinding

Professional Development

25 Qs

Part of Engine

Part of Engine

Professional Development

21 Qs

Maruti Popular - Focus Model - Celerio

Maruti Popular - Focus Model - Celerio

Professional Development

20 Qs

DWG DAY 24

DWG DAY 24

Professional Development

25 Qs

AES - Pneudraulic System

AES - Pneudraulic System

KG - Professional Development

25 Qs

Ulangan Hari Ke-2 Basic Engine

Ulangan Hari Ke-2 Basic Engine

Professional Development

21 Qs

FPL - TATA - SAFARI Vs Competition

FPL - TATA - SAFARI Vs Competition

Professional Development

15 Qs

006 Hot Water Quiz

006 Hot Water Quiz

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

George Harding

Used 22+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At which one of the following temperature ranges should hot water be stored?

30% – 35%

40% – 45%

50% – 55%

60% – 65%

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is the minimum size of an open vent pipe from a hot water cylinder?

15 mm.

22 mm.

28 mm.

35 mm.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following component parts is installed after the incoming stop valve?

Drain off.

Air vent.

By-pass valve.

Water meter.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is the maximum depth a water main service should be laid?

750 mm.

1000 mm.

1350 mm.

1650 mm.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To ensure correct operation, a single feed indirect cylinder requires which one of the following to be formed?

A heat exchanger.

An air bubble.

An annulus.

A flute.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is used by gravity primary pipework to circulate the water?

A circulating pump.

Conduction.

Radiation.

Convection.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is the minimum distance the distribution pipe from the cylinder should be installed horizontally before it connects to the open vent pipe?

450 mm.

750 mm.

1350 mm.

1650 mm.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?

Discover more resources for Professional Development