006 Hot Water Quiz

006 Hot Water Quiz

Professional Development

20 Qs

quiz-placeholder

Similar activities

Sanitaryware level 2

Sanitaryware level 2

Professional Development

15 Qs

9189 P1 Hot water

9189 P1 Hot water

Professional Development

16 Qs

Grader Knowledge

Grader Knowledge

Professional Development

20 Qs

Tiếng anh chuyên nghành

Tiếng anh chuyên nghành

Professional Development

21 Qs

Central heating components

Central heating components

Professional Development

20 Qs

T Level BSE plumbing systems

T Level BSE plumbing systems

University - Professional Development

15 Qs

6035 | Scientific Principles | Quiz 5

6035 | Scientific Principles | Quiz 5

Professional Development

25 Qs

Quiz SPresso & Baleno TSA

Quiz SPresso & Baleno TSA

Professional Development

20 Qs

006 Hot Water Quiz

006 Hot Water Quiz

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

George Harding

Used 22+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At which one of the following temperature ranges should hot water be stored?

30% – 35%

40% – 45%

50% – 55%

60% – 65%

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is the minimum size of an open vent pipe from a hot water cylinder?

15 mm.

22 mm.

28 mm.

35 mm.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following component parts is installed after the incoming stop valve?

Drain off.

Air vent.

By-pass valve.

Water meter.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is the maximum depth a water main service should be laid?

750 mm.

1000 mm.

1350 mm.

1650 mm.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To ensure correct operation, a single feed indirect cylinder requires which one of the following to be formed?

A heat exchanger.

An air bubble.

An annulus.

A flute.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is used by gravity primary pipework to circulate the water?

A circulating pump.

Conduction.

Radiation.

Convection.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is the minimum distance the distribution pipe from the cylinder should be installed horizontally before it connects to the open vent pipe?

450 mm.

750 mm.

1350 mm.

1650 mm.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?