1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one of the factors that could influence the cost of concrete works?

Type of formwork

Size of the construction site

Quantity of water used

Color of cement

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the concrete strength (N/mm2) at 7 days for a mix ratio of 1:2:4?

14

20

30

17

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How much does 1m3 of cement cost in Example 1.1?

RM28.00

RM10.50

RM120.27

RM35.00

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the labour cost for mixing concrete in Example 1.1?

RM40.00

RM50.00

RM170.27

RM10.00

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the total cost per m3 for concrete in Example 1.2?

RM28.49

RM172.93

RM25.54

RM198.87

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How much does 1 tonne of 16mm diameter high tensile steel reinforcement cost in Example 2.1?

RM2.75

RM2.60

RM2.56

RM2.79

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the cost per m2 for plywood formwork to horizontal soffit of slab in Example 3.1?

RM28.50

RM24.78

RM13.75

RM11.03

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?