Topic 2 Excavation and Construction Dewatering

Topic 2 Excavation and Construction Dewatering

University

12 Qs

quiz-placeholder

Similar activities

Electromechanic

Electromechanic

University

11 Qs

Understanding Resistance Concepts

Understanding Resistance Concepts

University

15 Qs

Quiz T2_Malaysia Practices on Sustainability

Quiz T2_Malaysia Practices on Sustainability

University

15 Qs

FlexSim Basic Foundations

FlexSim Basic Foundations

University

11 Qs

PEISS

PEISS

University

15 Qs

Compiler

Compiler

University

10 Qs

Electric Traction Quiz

Electric Traction Quiz

University

10 Qs

24EE2081 - Quiz1

24EE2081 - Quiz1

University

15 Qs

Topic 2 Excavation and Construction Dewatering

Topic 2 Excavation and Construction Dewatering

Assessment

Quiz

Engineering

University

Practice Problem

Medium

Created by

Norhazirah Imran

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To conduct subsurface construction work, the earth has to be excavated and it is important to consider surrounding movements. To hold the ground surface against topple, what is needed to be installed?

ground water

ground mixer

ground support

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For shallow excavation of dry sand and clay for a long-term stability, it can be acceptable to leave certain safe slope to prevent the sides of the ground against topple. The angle of the slope shall be _______.

equal to the angle of friction of the soil

equal to half of the angle of friction of the soil

3.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

For a large excavation, select one or more reason(s) for it to be infeasible/unsuitable to provide just a safe slope along side wall.

too large span

expensive

consume time

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For ground support installation, which of the following is the general way for sands and silts?

the sheeting is driven up to the excavation level, then lateral bracing is connected as excavation proceeds with depth

the sheeting is driven to a depth below the excavation level, then lateral bracing is connected as excavation proceeds with depth

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For ground support installation, which of the following is the general way for stiff clay and weak rocks?

the sheeting is driven to a depth below the excavation level, then lateral bracing is connected as excavation proceeds with depth

the sheeting is installed in open or partially completed excavation to a depth below the excavation level, then lateral bracing is connected

the sheeting is installed in open or partially completed excavation up to the excavation level, then lateral bracing is connected

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Construction Dewatering means to keep the excavated area ____.

Dry

Wet

Partially Wet/Dry

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select the dewatering process suitable for shallow excavation and water table up to a depth of 1 m.

Ditches and sumps

Well-points

Vacuum Dewatering

Deep-well Pump

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?