Topic 2 Excavation and Construction Dewatering

Quiz
•
Engineering
•
University
•
Medium
Norhazirah Imran
Used 3+ times
FREE Resource
12 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
To conduct subsurface construction work, the earth has to be excavated and it is important to consider surrounding movements. To hold the ground surface against topple, what is needed to be installed?
ground water
ground mixer
ground support
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
For shallow excavation of dry sand and clay for a long-term stability, it can be acceptable to leave certain safe slope to prevent the sides of the ground against topple. The angle of the slope shall be _______.
equal to the angle of friction of the soil
equal to half of the angle of friction of the soil
3.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
For a large excavation, select one or more reason(s) for it to be infeasible/unsuitable to provide just a safe slope along side wall.
too large span
expensive
consume time
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
For ground support installation, which of the following is the general way for sands and silts?
the sheeting is driven up to the excavation level, then lateral bracing is connected as excavation proceeds with depth
the sheeting is driven to a depth below the excavation level, then lateral bracing is connected as excavation proceeds with depth
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
For ground support installation, which of the following is the general way for stiff clay and weak rocks?
the sheeting is driven to a depth below the excavation level, then lateral bracing is connected as excavation proceeds with depth
the sheeting is installed in open or partially completed excavation to a depth below the excavation level, then lateral bracing is connected
the sheeting is installed in open or partially completed excavation up to the excavation level, then lateral bracing is connected
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Construction Dewatering means to keep the excavated area ____.
Dry
Wet
Partially Wet/Dry
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Select the dewatering process suitable for shallow excavation and water table up to a depth of 1 m.
Ditches and sumps
Well-points
Vacuum Dewatering
Deep-well Pump
Create a free account and access millions of resources
Similar Resources on Wayground
Popular Resources on Wayground
10 questions
Video Games

Quiz
•
6th - 12th Grade
20 questions
Brand Labels

Quiz
•
5th - 12th Grade
15 questions
Core 4 of Customer Service - Student Edition

Quiz
•
6th - 8th Grade
15 questions
What is Bullying?- Bullying Lesson Series 6-12

Lesson
•
11th Grade
25 questions
Multiplication Facts

Quiz
•
5th Grade
15 questions
Subtracting Integers

Quiz
•
7th Grade
22 questions
Adding Integers

Quiz
•
6th Grade
10 questions
Exploring Digital Citizenship Essentials

Interactive video
•
6th - 10th Grade
Discover more resources for Engineering
20 questions
Definite and Indefinite Articles in Spanish (Avancemos)

Quiz
•
8th Grade - University
7 questions
Force and Motion

Interactive video
•
4th Grade - University
36 questions
Unit 5 Key Terms

Quiz
•
11th Grade - University
7 questions
Figurative Language: Idioms, Similes, and Metaphors

Interactive video
•
4th Grade - University
15 questions
Properties of Equality

Quiz
•
8th Grade - University
38 questions
WH - Unit 3 Exam Review*

Quiz
•
10th Grade - University
21 questions
Advise vs. Advice

Quiz
•
6th Grade - University
12 questions
Reading a ruler!

Quiz
•
9th Grade - University