Phase 3 - Electrical checkpoint test 2

Phase 3 - Electrical checkpoint test 2

Professional Development

49 Qs

quiz-placeholder

Similar activities

ACR-206 Midterm

ACR-206 Midterm

Professional Development

46 Qs

UJIAN RATING AF WAGG 2023

UJIAN RATING AF WAGG 2023

Professional Development

46 Qs

Med Terms Nervous System

Med Terms Nervous System

Professional Development

50 Qs

Rhythm Strip Interpretations Quiz WK 2 (115)

Rhythm Strip Interpretations Quiz WK 2 (115)

Professional Development

47 Qs

ETC 602 - SWITCHGEAR

ETC 602 - SWITCHGEAR

Professional Development

50 Qs

RADR 2309 Ch. 6 X-Ray Tube

RADR 2309 Ch. 6 X-Ray Tube

Professional Development

48 Qs

GMJ 6035 MCQ* electrical

GMJ 6035 MCQ* electrical

Professional Development

53 Qs

nintendo quiz

nintendo quiz

Professional Development

44 Qs

Phase 3 - Electrical checkpoint test 2

Phase 3 - Electrical checkpoint test 2

Assessment

Quiz

Other

Professional Development

Medium

Created by

Ben Ashford

Used 1+ times

FREE Resource

49 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following should be carried out before any electrical work takes place?

Safe isolation.

Safe insulation.

Safe continuity.

Safe polarity.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following units should be used to check if a circuit is dead?

Multimeter.

RCD.

Proving.

OHMs.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following tests should be carried out on insulation?

Polarity.

Resistance.

Impedance.

Continuity.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The floor area covered by a ring final circuit must not exceed

25 m²

50 m²

75 m²

100 m²

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The main protection on a domestic consumer unit is provided by which one of the following?

RCD.

RBC.

MCB.

MCD.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A 9.8 kW shower should be protected by a circuit breaker rated at

35 amp

40 amp

45 amp

50 amp

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following tests should be carried out to ensure that phase and neutral are not cross connected?

Polarity

Resistance

Impedance

Continuity

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?