T25CT building and footing setout

T25CT building and footing setout

University

15 Qs

quiz-placeholder

Similar activities

Lift and escalator

Lift and escalator

University - Professional Development

15 Qs

Management basics

Management basics

12th Grade - University

15 Qs

L3 Plumbing Planning and supervision PT1

L3 Plumbing Planning and supervision PT1

University - Professional Development

10 Qs

RIBA POW Multi choice

RIBA POW Multi choice

University

20 Qs

How well do you know APW?

How well do you know APW?

1st Grade - Professional Development

15 Qs

Project Management Overview

Project Management Overview

University

14 Qs

Personal Finance Managment

Personal Finance Managment

University

15 Qs

SAVING THE TIGER

SAVING THE TIGER

KG - Professional Development

10 Qs

T25CT building and footing setout

T25CT building and footing setout

Assessment

Quiz

Professional Development

University

Medium

Created by

Chris Ho

Used 5+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is steel usually combined with concrete?

To reduce cost

To increase flexibility

To enhance strength and durability

To improve appearance

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a characteristic of aluminum that makes it effective against elements that wear other metals?

High density

High thermal conductivity

Corrosion resistance

High melting point

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is the first step in setting up a site according to project plans and specifications?

Testing the soil and structural engineering assessments

Demolishing any existing structures

Clearing the land

Installing retaining walls if they’re needed

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the process of marking the position, shape, and size of a building on a construction site called?

Building layout

Building set-out

Building design

Building planning

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who provides the details that are transferred to the ground during the building set-out process?

The contractor and engineer

The architect and surveyor

The builder and inspector

The client and designer

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What can errors made during the building set-out result in?

Increased project speed

Future costly alterations

Improved building design

Reduced construction costs

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done if the boundary pegs are missing?

Ignore the issue and proceed with construction

Use approximate measurements

Employ a licensed surveyor to replace them

Consult with the project manager

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?