Feed and Expansion (F&E) Cistern Quiz

Feed and Expansion (F&E) Cistern Quiz

12th Grade

63 Qs

quiz-placeholder

Similar activities

Maintenance and Inspection Quiz

Maintenance and Inspection Quiz

12th Grade

68 Qs

98-349 Microsoft

98-349 Microsoft

9th Grade - University

58 Qs

Quiz Review

Quiz Review

12th Grade

68 Qs

CompTIA ITF D3 Apps and Software Part 2 (TO)

CompTIA ITF D3 Apps and Software Part 2 (TO)

12th Grade

62 Qs

Instructional Pedagogy

Instructional Pedagogy

9th Grade - University

68 Qs

Keyboarding

Keyboarding

6th - 12th Grade

65 Qs

Digital Media Review 2024

Digital Media Review 2024

9th - 12th Grade

66 Qs

Electrical Hand & Power Tools Test

Electrical Hand & Power Tools Test

12th Grade

61 Qs

Feed and Expansion (F&E) Cistern Quiz

Feed and Expansion (F&E) Cistern Quiz

Assessment

Quiz

Instructional Technology

12th Grade

Hard

Created by

George Ellison

FREE Resource

63 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main purpose of the Feed and Expansion (F&E) cistern in an open vented system?

To store cold water for household use

To allow the heated water in the system to expand and to operate at atmospheric pressure

To filter impurities from the water

To heat the water in the system

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where is the Feed and Expansion (F&E) cistern commonly located in an open vented system?

In the basement

In the kitchen

In the loft

In the garden

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At what level should the base of the Feed and Expansion (F&E) cistern be placed?

Above the cold water storage cistern

Below the cold water storage cistern

At the same level as the cold water storage cistern

At ground level

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the function of the Feed and Expansion (F&E) cistern in an open vented system?

To fill the system up with water

To drain the system

To cool the water in the system

To circulate the water in the system

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the common capacity of the Feed and Expansion (F&E) cistern?

10 litres

18 litres

22 litres

15 litres

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where is the 15mm cold feed located in relation to the F&E cistern?

Above the F&E

Below the F&E

To the side of the F&E

Inside the F&E

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum height the 22mm open vent from the primaries must rise above the water level?

300mm

450mm

500mm

600mm

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?