Soundness Testing Quiz

Soundness Testing Quiz

12th Grade

54 Qs

quiz-placeholder

Similar activities

PERSIAPAN UNBK TKR PAKET 2

PERSIAPAN UNBK TKR PAKET 2

12th Grade

50 Qs

Automotive Tools and Techniques Quiz

Automotive Tools and Techniques Quiz

12th Grade

58 Qs

NOCTI 3

NOCTI 3

12th Grade

51 Qs

Water Regulations Quiz

Water Regulations Quiz

12th Grade

56 Qs

Ag Power Midterm Exam Jan 2025

Ag Power Midterm Exam Jan 2025

9th - 12th Grade

50 Qs

pemeliharaan mesin  sepeda motor kelas XII

pemeliharaan mesin sepeda motor kelas XII

12th Grade

50 Qs

Refrigeration Quiz

Refrigeration Quiz

12th Grade

51 Qs

WHMIS Test

WHMIS Test

9th - 12th Grade

50 Qs

Soundness Testing Quiz

Soundness Testing Quiz

Assessment

Quiz

Instructional Technology

12th Grade

Hard

Created by

George Ellison

Used 1+ times

FREE Resource

54 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be checked during the visual inspection before soundness testing?

Open ends, soldered joints made, compression joints tight, clips are in place

Open ends, soldered joints made, compression joints loose, clips are missing

Closed ends, soldered joints made, compression joints tight, clips are in place

Open ends, unsoldered joints, compression joints tight, clips are in place

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the next step after the visual inspection in soundness testing?

Conducting a pressure test

Carrying out the soundness test

Performing a leak test

Conducting a flow test

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What types of pipes require different soundness tests?

Rigid pipe (copper and steel) and plastic pipe

Flexible pipe and plastic pipe

Rigid pipe (copper and steel) and flexible pipe

Copper pipe and steel pipe

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the testing and decommissioning process?

Set up equipment

Visual inspection

Test period

Final check

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which step comes immediately after setting up the equipment in the testing and decommissioning process?

Visual inspection

Final check

Test period

Complete documentation

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the final step in the testing and decommissioning process?

Final check

Test period

Complete documentation

Visual inspection

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the soundness testing of rigid pipes (copper and steel)?

Walk around the system and check for leaks

Slowly fill the system with water

Attach the hydraulic test bucket

Pump system up to 1.5 times the working pressure

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?