APPENDIX B PART 2

APPENDIX B PART 2

Professional Development

30 Qs

quiz-placeholder

Similar activities

Temu Pelanggan : G15-2 Baja Profil, Kawat dan Tulangan

Temu Pelanggan : G15-2 Baja Profil, Kawat dan Tulangan

Professional Development

25 Qs

Evaluasi Kognitif AMT Tahuna - Mei 2021

Evaluasi Kognitif AMT Tahuna - Mei 2021

Professional Development

25 Qs

2018 IPC CH 11-14 Study Quiz

2018 IPC CH 11-14 Study Quiz

Professional Development

25 Qs

2023 - Bimtek Pengembangan Kompetensi ASN Pengadilan Tinggi Riau

2023 - Bimtek Pengembangan Kompetensi ASN Pengadilan Tinggi Riau

Professional Development

26 Qs

All Time - Mixing Bowls & Colanders, Strainers

All Time - Mixing Bowls & Colanders, Strainers

Professional Development

27 Qs

Gastrointestinal / Endocrine Emergencies

Gastrointestinal / Endocrine Emergencies

KG - Professional Development

25 Qs

RSO - Basic Course Operating Room Personal

RSO - Basic Course Operating Room Personal

Professional Development

25 Qs

UH 1 Belajar di Rumah GAMTEK

UH 1 Belajar di Rumah GAMTEK

Professional Development

25 Qs

APPENDIX B PART 2

APPENDIX B PART 2

Assessment

Quiz

Other

Professional Development

Hard

Created by

Serene Studio

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

required if quantity of sewage exceeds 152.4 lineal meter

Dosing Tank

Septic tank

Distribution tank

Seepage pits

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

interval of discharge of dosing tank via automatic siphon pump

3 or 4 hours

2 or 3 hours

1 or 2 hours

3 or 5 hours

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

dosing capacity at one time

50 % to 60%

60% to 75%

60% to 85%

50 % to 75%

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

siphons or pumps required if total length pipe exceeds 304.8m; each serving 1/2 of the leach field

1

2

3

4

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

DISPOSAL FIELDS

minimum spacing between trenches or leaching beds plus 0.6 m for each additional 0.3m of depth in excess of 0.3m below the bottom of the line

1.2m

1.8m

0.9m

1.5m

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

DISPOSAL FIELDS

distance on center of each distribution drain lines

1.2m

1.8m

0.9m

1.5m

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

DISPOSAL FIELDS

maximum distance of perimeter of leaching bed to a distribution drain line

1.2m

1.8m

0.9m

1.5m

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?